25/04432/SCOP - EIA Scoping Report Decided

Proposal

EIA Scoping Opinion request pursuant to Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for an outline planning application (all matters reserved apart from access) for the phased redevelopment of Cambridge Business Park to provide office, research and development space, retail and leisure and community uses, residential dwellings, floorspace for sui generis residential use, alongside new vehicle and pedestrian/cycle accesses, mobility hubs, landscaping, public open spaces, ancillary plant and infrastructure and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Nov 2025
✓
EIA Scoping Report Issued
19 Jan 2026

EIA Scoping Report Issued on 19 Jan 2026 · Delegated Decision · Last checked 7 Oct 2026

Documents 22

All documents on the council site ↗

Site constraints 2

National infrastructure project 229 m away: Cambridge Waste Water Treatment Plant Relocation
The site is 229 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: A14 Cambridge to Huntingdon Improvement Scheme (decided, 559 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 657 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Cambridge (Cambridge) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,343 m² (25,220 sq ft)
Energy ratingC (asset rating 74)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in April 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
EIA Scoping Report
Postcode
CB4 0WZ
Received
13 Nov 2025
Validated
13 Nov 2025
Ward
East Chesterton
Case officer
Show
Target decision
19 Jan 2026
Decision
EIA Scoping Report Issued
Decision date
19 Jan 2026
Decision level
Delegated Decision
Agent
WSP

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
18 Dec 2025
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.