101 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0FY Data via plota.co.uk

26/04078/FUL - Full Application Awaiting decision

Proposal

Installation of rooftop kitchen ventilation and extraction plant, associated ductwork and ancillary works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Oct 2026
✓
Validated
6 Nov 2026
✓
Consultation
19 Nov 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 8 Jan 2027, from South Cambridgeshire's recent utility and infrastructure works.

Site constraints 3

National infrastructure project 145 m away: Cambridge Waste Water Treatment Plant Relocation
The site is 145 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: A14 Cambridge to Huntingdon Improvement Scheme (decided, 306 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 898 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Cambridge (Cambridge) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area8,309 m² (89,437 sq ft)
Energy ratingB (asset rating 49)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in March 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
CB4 0FY
Received
29 Oct 2026
Validated
6 Nov 2026
Ward
Milton & Waterbeach
Parish
Milton CP
Target decision
1 Jan 2027
Applicant
Show
Agent
Newsteer

Decision outlook

Day 17 of the 56-day target. South Cambridgeshire usually decides utility and infrastructure works by day 56.

Day 1739 days to the 56-day target
57%decided within 8 weeks
93%approved
97decided in the last year

Plota live figures for utility and infrastructure works decided by South Cambridgeshire in the last twelve months, from validation. South Cambridgeshire decision record →

Public comments

No public comments yet.

16 neighbours consulted · Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
19 Nov 2026
Statutory expiry
1 Jan 2027
Env. assessment
No
South Cambridgeshire
Planning Authority Score
8.1/10
Excellent
#25 of 296 overall
Relevant to this application:
Householder decisions

South Cambridgeshire is one of the fastest councils in England for householder decisions: #24 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
South Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #45 of 296
95%
Householder approved
Above avg (90%) #91 of 296
84%
Decided in 8 weeks
Above avg (63%) #24 of 296
31%
Extended time limit
Below avg (41%) #60 of 296
86%
Minor dwellings approved
215 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
79%
Change of use approved
38 decided
1,509
Total decisions
96 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.