230 - 236 North End Road, London, W14 9NU Data via plota.co.uk

P/2026/02786/DET - Details to Meet Conditions Full/Outline REGISTERED: Under Consultation

Proposal

Submission of details of all external materials to be used in the faces and roofs of the development (including physical material samples), pursuant to Condition 3; details in plan, section and elevation (at a scale of not less than 1:20) of the following: exterior cladding and roofing, new and replacement window details, gates and railings, and rooftop plant associated enclosures, pursuant to Condition 4; details of a statement of how 'Secured by Design' requirements are to be adequately achieved; pursuant to Condition 14; details of how the structure of the basement will be waterproofed (such as the provision of a cavity membrane and sump/pump system as part of the waterproofing measures for the basement), pursuant to Condition 17; details of a scheme for temporary solid timber hoarded fencing (minimum height 2.5 metres) around the perimeter of the site on all site boundaries and/or enclosure of the site, pursuant to Condition 18; details of an Air Quality Dust Management Plan (AQDMP), pursuant to Conditions 19 and 20; details of a Ventilation Strategy Report to mitigate the impact of existing poor air quality for the 19 self-contained dwellinghouses (Class C3), pursuant to Condition 22; details of an enhanced sound insulation value DnT,w and L'nT,w of at least 5dB above the Building Regulations value, for the floor/ceiling/wall structures separating different types of rooms/ uses in adjoining dwellings, pursuant to Condition 35; details of the external sound level emitted from plant/machinery/equipment and mitigation measures as appropriate, pursuant to Condition 37; details of anti-vibration measures, pursuant to Condition 38; details of the installation, operation, and maintenance of the odour abatement equipment and extract system, pursuant to Condition 39; details of a Construction Management Plan and a Construction Logistics Plan, pursuant to Condition 41; details of a preliminary risk assessment report, pursuant to Condition 42; details of a site investigation scheme, pursuant to Condition 43; details of an onward long-term monitoring methodology report, pursuant to Condition 47; and details of a foundation/piling layout plan clearly indicating the locations of all foundation/piles to be installed on the development site, pursuant to Condition 49 of planning permission reference: dated 6th October 2026. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Oct 2026
✓
Validated
30 Oct 2026
Decision
Expected by 29 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 29 Jan 2027.

Comments are open until 24 Nov 2026

Comment on this application ↗

Documents 26

All documents on the council site ↗

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions details submitted for 3, 4, 14, 17, 18, 19, 20, 22, 35, 37, 38, 39, 41, 42, 43, 47, 49

    • ConditionsSubmission of details of all external materials to be used in the faces and roofs…This applicationP/2026/02786/DET

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Fulham Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 712 m away: Thames Tideway Tunnel
The site is 712 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area115 m² (1,238 sq ft)
Energy ratingD (asset rating 83)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Details to Meet Conditions Full/Outline
Postcode
W14 9NU
Received
29 Oct 2026
Validated
30 Oct 2026
Ward
West Kensington
Case officer
Show
Applicant
Show

Consultation & key dates

Consultation
3 Nov 2026
Comments by
24 Nov 2026
Statutory expiry
25 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Major dwellings

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.