84C Lillie Road London SW6 1TL Data via plota.co.uk

2025/02761/FUL - Full Planning Application REGISTERED: Under Assessment

Proposal

Erection of a rear roof extension; erection of rear extensions at ground, first and second floor levels; formation of roof terraces at first and third floor levels; installation of 3no rooflights in the front roofslope; installation of French doors to replace the existing window at third floor level to the rear elevation; installation of a door to replace the existing window to the rear of main building, infilling of the existing windows and installation of French doors to the side of rear back addition at first floor level; alterations to existing shopfront to include the installation of new residential entrance door; change of use and conversion of upper floor levels from HMO (Class C4) into 3 x 1 bedroom and 1 x 3 bedroom self-contained residential flats (Class C3); formation of refuse and bike storage at the rear of proposed ground floor back addition. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Oct 2025
✓
Validated
21 Oct 2025
Decision
Target date was 16 Dec 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 6 Nov 2026; it is now day 381.

The consultation period closed on 19 Nov 2025.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Fulham Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 775 m away: Thames Tideway Tunnel
The site is 775 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 1TL
Received
7 Oct 2025
Validated
21 Oct 2025
Ward
West Kensington
Case officer
Show
Applicant
Show
Leaseholder
Show

Decision outlook

Day 381, past the statutory target. 62% of full applications in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 3 Nov 2026.

Day 381325 days past the 56-day target
28%decided within 8 weeks
98%approved
758decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
21 Oct 2025
Comments by
19 Nov 2025
Site or press notice
29 Oct 2025
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Change of use

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.