25/00059/FULL - Full Planning Permission Application Approved

Proposal

Variation of condition 5 of planning permission dated 09 February 2023 (RN: ) for the use of the courtyard area to the front of unit 28 (13 Slingsby Place/St Martins Courtyard) for the placing of 10 tables, 20 chairs, two parasols, four external heaters, four statues, 21 planters and a free standing menu box, Namely, to extend the use of the pavement for the placing of street furniture for further two year period until 28 February 2027. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Jan 2025
✓
Approved
6 Mar 2025

Approved on 6 Mar 2025 · Delegated Decision · Last checked 9 Nov 2026

Associated applications 2

  • Part of

    VariationApprovedcouncil archive

    Conditions 5 varied

    • VariationVariation of condition 5 of planning permission dated 09 February 2023 (RN) for the use…This application25/00059/FULL

Site constraints 11

2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 1.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 389 m away: Thames Tideway Tunnel
The site is 389 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 41 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
71 listed buildings within 150 m
Nearest: 3 and 5, Mercer Street Wc2, Grade II, 50 m away · 2 Grade II*, 69 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 71 with distances
Historic England ↗
Conservation area 23 m away: Covent Garden
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Protected tree 12 m away: W670_T1, order W670; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area364 m² (3,918 sq ft)
Energy ratingB (asset rating 28)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in April 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
WC2E 9AB
Received
6 Jan 2025
Validated
6 Jan 2025
Ward
St James's
Case officer
Show
Target decision
6 Mar 2025
Decision
Application Permitted
Decision date
6 Mar 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Poppleston Allen
Leaseholder
Show

Public comments

No public comments yet.

60 neighbours consulted · Last counted 9 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13675466
Planning Portal ref
PP-13675466
Comments by
26 Feb 2025
Site or press notice
5 Feb 2025
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 overall
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications: #258 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.