Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50… Data via plota.co.uk

PA/25/02135/NC - Observations to Other Authorities Decided

Proposal

Observation requested by City of London for: Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works (RE-CONSULTATION due to the submission of additional information) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 8 Dec 2025
Decision
Target date was 7 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 345.

Site constraints 11

10 listed buildings within 150 m of the postcode pin
Nearest: Liverpool Street Station, Grade II, the postcode pin is inside its outline · 2 Grade II*, 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project about 950 m away: Thames Tideway Tunnel
The site is about 950 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 159 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 34 m away: Bishopsgate; Scheduled monument about 185 m away: London Wall: remains of Roman and medieval wall from W end of All Hallows Church to 38 Camomile Street; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 35 m away: Liverpool Street; Designated open space about 43 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Observations to Other Authorities
Postcode
EC2M 7PY
Received
around 8 Dec 2025
Validated
8 Dec 2025
Case officer
Show
Target decision
7 Jan 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 345, past the statutory target. 84% of other in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 345289 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Tower Hamlets to go on. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
7 Jan 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026