1 Basinghall Avenue London EC2V 5DD Data via plota.co.uk

25/01818/MDC - Submission of details (Planning) Approved

Proposal

Submission of a scheme which specifies the fume extract arrangements, details relating to mounting of mechanical plant, and inclusive access management plan, pursuant to conditions 5, 6 and 8 of planning permission dated 03/09/2025 (ref: ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Dec 2025
✓
Consultation
7 Jan 2026
✓
Approved
6 May 2026

Approved on 6 May 2026 · Delegated Decision · Last checked 3 Oct 2026

Associated applications 3

Licences at this address

  • Licence Standard Chartered Bank Premises licence · in force since 30 Jul 2026 Licensed hours: alcohol until midnight
  • Licence Basinghall Limited Premises licence · in force since 6 Mar 2026 Licensed hours: alcohol Mon-Fri until 23:00

Licensed hours are what the licence permits, not opening times.

Site constraints 13

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 86 m away: London Wall: section of Roman wall within the London Wall underground car park, 25m north of Austral House and 55m north west of Coleman Street
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
National infrastructure project 668 m away: Thames Tideway Tunnel
The site is 668 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 33 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
16 listed buildings within 150 m
Nearest: 65 and 65a Basinghall Street, Grade II, 47 m away · 1 Grade I, 3 Grade II*, 12 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 16 with distances
Historic England ↗
Also on the record
Wider setting of protected view 8A.1 Westminster Pier to St Paul's Cathedral; 9A.1 King Henry's Mound to St Paul's Cathedral; Registered park or garden 156 m away: The Barbican; Conservation area 78 m away: Bank; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 18 m away; Town centre 94 m away: Moorgate.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area24,376 m² (262,381 sq ft)
Energy ratingA (asset rating 25)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in August 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Submission of details (Planning)
Postcode
EC2V 5DD
Received
24 Dec 2025
Validated
24 Dec 2025
Ward
Bassishaw
Case officer
Show
Target decision
18 Feb 2026
Decision
Approved
Decision date
6 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Mather Design Studio

How this decision compares

Decided in 133 days from validation, 59 days slower than City of London's median of 74 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

38%decided within 8 weeks
100%approved
740decided in the last year

Plota live figures for discharge of conditions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14589258
Planning Portal ref
PP-14589258
Consultation
7 Jan 2026
Comments by
28 Jan 2026
Committee
6 May 2026
Statutory expiry
18 Feb 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.