Full planning application for 80 residential units (C3), associated car parking, garages; vehicular… Data via plota.co.uk

23/01153/NMC04 - Non Material Amendment 04 Approved

Proposal

Non-material amendment to approved application dated 31.01.2025 (Full planning application for 80 residential units (C3), associated car parking, garages; vehicular, pedestrian and cycle access and infrastructure; foul and surface water drainage infrastructure; public open space with play area and landscape and biodiversity enhancements; with vehicular access from Neil Fox Way varied by 23/01153/NMC01 and 23/01153/NMC02 comprising the re-siting of the proposed substation to the turning head adjacent to plot 47 and associated landscape details together with the variation of conditions 2 (approved plans); 27 (overheating); 32 (access), 39 (turning facilities) and 41 (engineering strategy) to insert revised plans. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 May 2026
✓
Validated
23 Jul 2026
✓
Consultation
24 Jul 2026
✓
Approved
27 Aug 2026

Approved on 27 Aug 2026 · Delegated Decision · Last checked 28 Aug 2026

Documents 24

All documents on the council site ↗

Associated applications 10

Site constraints 4

Air quality management area: Wakefield City AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Wakefield built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Non Material Amendment 04
Received
7 May 2026
Validated
23 Jul 2026
Ward
Wakefield East
Case officer
Show
Target decision
20 Aug 2026
Decision
Application Approved
Decision date
27 Aug 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 28 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14918033
Planning Portal ref
PP-14918033
Consultation
24 Jul 2026
Comments by
14 Aug 2026
Statutory expiry
20 Aug 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026