Land North Of Warbank Social Club Layhams Road Keston BR2 6AR Data via plota.co.uk

26/01586/AUT - Consultation from Adjoining Authority Decided

Proposal

Installation of a Battery Energy Storage System (BESS), together with associated ancillary infrastructure, equipment and access arrangements' to extend the time limiting restriction of the operational life of the BESS from 30 to 40 years - Adjoining Borough Consultation from London Borough of Bromley. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 May 2026
✓
Consultation
10 Jun 2026
Decision
Expected by 25 Jun 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 134.

Site constraints 4

Air quality management area: Croydon AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 3; Inside the Croydon built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Croydon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Croydon
Application type
Consultation from Adjoining Authority
Postcode
BR2 6AR
Received
28 May 2026
Validated
28 May 2026
Ward
Out Of Borough
Case officer
Show
Target decision
25 Jun 2026
Decision level
Delegated Business Meeting
Applicant
Show
Agent
London Borough of Bromley

Decision outlook

Day 134, past the statutory target. 87% of utility and infrastructure works in Croydon are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 13478 days past the 56-day target
57%decided within 8 weeks
87%approved
30decided in the last year

Plota live figures for utility and infrastructure works decided by Croydon in the last twelve months, from validation. Croydon decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
Email received
Consultation
10 Jun 2026
Statutory expiry
25 Jun 2026
Croydon
Planning Authority Score
3.6/10
Below average
#215 of 296 councils
Relevant to this application:
Householder decisions

Croydon ranks #159 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Croydon decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #286 of 296
87%
Householder approved
Below avg (90%) #230 of 296
62%
Decided in 8 weeks
Below avg (63%) #159 of 296
44%
Extended time limit
Above avg (41%) #177 of 296
45%
Minor dwellings approved
238 decided (1-9 homes)
58%
Major dwellings approved
12 decided (10+ homes)
53%
Change of use approved
53 decided
1,590
Total decisions
403 refused in the year to March 2026