Upton Road And Raynham Road London N18 Data via plota.co.uk

26/03510/CND - Discharge Condition Application in Progress

Proposal

Details submitted pursuant to reference : landscaping (15c) in respect of material amendment to and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: . Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
19 Aug 2026
Consultation
26 Aug 2026
Decision
Expected by 14 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 13 Oct 2026, from Enfield's recent changes of use. Comments are open until 16 Sept 2026.

Comment on this application ↗

Associated applications 14

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Enfield built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Discharge Condition
Postcode
N18 2LJ
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
Upper Edmonton
Case officer
Show
Target decision
14 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
ECE Architecture Limited

Decision outlook

Day 26 of the 56-day target. Enfield usually decides changes of use by day 55.

Day 2630 days to the 56-day target
85%decided within 8 weeks
75%approved
316decided in the last year

Plota live figures for changes of use decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15170598
Consultation
26 Aug 2026
Comments by
16 Sept 2026
Statutory expiry
14 Oct 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 councils
Relevant to this application:
Change of use

Enfield is one of the fastest councils in England for householder decisions, ranking #15 out of 296. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026