Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP Data via plota.co.uk

C25/0740/20/EIA - Environmental Impact Assessment In Progress

Proposal

Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application with all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2025
✓
Validated
28 Aug 2026
Decision
Expected by 7 Jan 2027

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 20 Feb 2027, from Gwynedd's recent commercial and major works. Comments are open until 19 Oct 2026.

Comment on this application ↗

Documents 139

Statements & assessments 41

PDF 14_09_2026-Diwygiedig-Amended-5030559-RIDGE-XX-XX-TA-H-0001-P07-Transport-Assessment.pdf Supporting Documents · 14 Sept 2026 View ↗ PDF 14_09_2026-Disodli-Superseded-Transport-Assessment.pdf Supporting Documents · 14 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Apx-6_8-Tree-Survey.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Tree-Survey.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Transport-Assessment.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Planning-Statement.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Outline-Energy-and-Sustainability-Statement.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-BREEAM-Pre-Assessment.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additiional-Information-Env-Colour-Assessment.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Preliminary-Ecological-Assessment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Apx-9_1-Noise-Assessment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Noise-Impact-Assessment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-GI-Statement.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_082026-Disodli-Superseded-Green-Infrastructure-Statement-Part3.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Green-Infrastructure-Statement-Part1.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Green-Infrastructure-Statement-Part2.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Apx-7_2-Proposed-Surface-Water-Foul-Drainage-Strategy.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Apx-7_1-FCA-Drainage-Strategy.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-FCA-Drainage-Strategy-Part2.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-FCA-Drainage-Strategy-Part1.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-12_3-Assessments-of-Effects.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-11_3-Climate-Risk-Assessment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-13_2-Geophysical-Survey-Report.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-13_1-Designated-Heritage-Assets-Plot.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-9_2-Noise-Sensitive-Receptor-Locations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-9_1-Noise-Monitoring-Locations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_6-Ground-Level-Tree-Assessment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_5-Phase-1-Habitat-Survey.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_2-Ecological-Study-Area.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Design-Access-Statement.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part9.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part8.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part7.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part5.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part6.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part4.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part2.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part3.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Design-Access-Statement-Part1.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 25-11-25-Former-Ferodo-Site-Data-Centre-Needs-Assessment-Issue.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF Welsh-Language-Impact-Assessment.pdf Supporting Documents · 10 Oct 2025 View ↗

Plans & drawings 42

PDF 14_09_2026-Disodli-Superseded-Travel-Plan.pdf Supporting Documents · 14 Sept 2026 View ↗ PDF 14_09_2026-Diwygiedig-Amended-5030559-RIDGE-XX-XX-TP-H-0001-P05-Travel-Plan-Submission-09_2026-5th-Issue.pdf Supporting Documents · 14 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_9-AIA-Drawings.pdf Plans · 2 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Apx-6_8-Tree-Constraints-Plan.pdf Plans · 2 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Tree-Constraints-Plan.pdf Plans · 2 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-Travel-Plan.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-110-Illustrative-Site-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-120-Existing-Site-Sections-01-03.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-122-Illustrative-Proposed-Site-Sections-01-03.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Landscape-Strategy-L103.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-101-Existing-Site-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-102-Proposed-Block-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-104-Site-Platform-Levels.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-105-Maximum-Build-Zone.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-106-Site-Access-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-107-Demolition-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-110-Illustrative-Site-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-120-Existing-Site-Sections.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-122-Proposed-Site-Sections.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-L103-Landscape-Strategy.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-101-Existing-Site-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-104-Site-Platform-Levels.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-102-Proposed-Block-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-105-Maximum-Build-Zone.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-106-Site-Access-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-107-Demolition-Plan.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additioanl-Information-132-Proposed-Section-Across-Menai-Strait.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-114-Illustrative-Site-Plan-2.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-110001-P01-Site-Entrance-Proposal.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Cross-Sections-v4-L201-A-A.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Cross-Sections-v4-L202-B-B.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Cross-Sections-v4-L204-D-D.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Cross-Sections-v4-L203-C-C.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Cross-Sections-v4-L205-E-E.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-GI-Parameter-Plan-L104.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-GI-Strategy-L102.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Site-Analysis-L101.pdf Plans · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-3_4-Site-Access-Plan.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-3_5-Demolition-Plan.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-3_1-Site-Boundary-Plan.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 25_02_2026-Diwygiedig-Amended-3562-TSP-ZZ-ZZ-DR-A-05-103.pdf Plans · 13 Mar 2026 View ↗ PDF 25_02_2026-Disodli-Superseded-103-Site-Location-Plan.pdf Plans · 13 Mar 2026 View ↗

Other documents 53

PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-71-79.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-61-70.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-51-60.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-31-40.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-41-50.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-11-20.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-21-30.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Appendix-12_1-Pages-1-10.pdf Supporting Documents · 10 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-260828-CL-Add-Info-inc-ES.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_9-AIA.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_4-GLTA.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Outline-LEMP.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Design-Code.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Canolfan-Ddata-Menai-Engagement-Report.pdf Supporting Documents · 2 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Apx-6_1-EcIA.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_7-OtterSurvey.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_5-WinteringBirds.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Diwygiedig-Amended-Apx-6_3-PEA.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-LVApp-Appendix-1.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Disodli-Superseded-LVApp.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-14_2-GCA.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-14_4-Asbestos-Reinspection-2018.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-14_1-DTS-Report.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-14_3-RSVP.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-13_1-Historic-Environment-DBA.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-12_4-Planning-Policy.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-12_2-Methodology.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-11_4-Inter-related-Effects.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-11_2-GHG-Emission-Calculations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-10_1-Lighting-Design-and-Assesment.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-11_1-Legislative-and-Policy-Context.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-8_1-to-8_6-Air-Quality.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-6_2-HRAScreeningReport.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-2_3-Committed-Sites-Redacted.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-2_2-Scoping.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-2_1-Screening.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-Apx-14_5-ALC-Report.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-13_3-HLC-Plot.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-13_2-HER-Plot.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-9_5-Daytime-Testing-Operations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-9_3-Daytime-Normal-Operations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-9_4-Night-time-Normal-Operations.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_7-Habitat-Loss-Retention-Mitigation.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_4-Statutory-and-Non-Statutory-Designated-Sites.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-6_3-International-Designations-SPA-SAC.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-3_3-Build-Zones.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-Fig-3_2-Site-Platform-Levels.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-_Site-Boundary.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-EIA-Vol-2-Cover-and-contents.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-ychwanegol-Additional-Information-EIA-Vol-3-NTS.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 28_08_2026-Gwybodaeth-Ychwanegol-Additional-Information-EIA-Vol-1-Main-Text.pdf Supporting Documents · 1 Sept 2026 View ↗ PDF 25_02_2026-Gwybodaeth-Ychwanegol-Additional-Information-260225-CL-Amended-RL.pdf Supporting Documents · 13 Mar 2026 View ↗ PDF Covering Letter Dated 9 October 2025.pdf Supporting Documents · 10 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 1

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 20 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Environmental Impact Assessment
Postcode
LL55 1TP
Received
9 Oct 2025
Validated
28 Aug 2026
Ward
Bethel a'r Felinheli
Parish
Felinheli
Case officer
Show
Target decision
7 Jan 2027
Decision level
Pwyllgor Cynllunio / Planning Committee
Applicant
Show
Agent
Peter Waldren

Decision outlook

Day 37 of the 56-day target. Gwynedd usually decides commercial and major works by day 176.

Day 37139 days to the predicted decision (day 176)
7%decided within 8 weeks
87%approved
11%go to committee

Plota live figures for commercial and major works decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
19 Oct 2026
Statutory expiry
7 Jan 2027