Cliff Hollins Farm, Heaton, Heaton, Data via plota.co.uk

NP/GDO/0626/0613 - Application under the GPDO Approved

Proposal

GDO Notification - Agricultural Building for hay and machinery storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jun 2026
✓
Validated
22 Jun 2026
✓
Approved
15 Jul 2026

Approved on 15 Jul 2026 · Last checked 9 Sept 2026

Site constraints 4

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National park about 14 m away: Peak District
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
National infrastructure project about 1.7 km away: Peak Cluster CCS Pipeline, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Application under the GPDO
Received
20 Jun 2026
Validated
22 Jun 2026
Parish
Leekfrith
Case officer
Show
Decision
Prior Approval is not Required
Decision date
15 Jul 2026
Applicant
Show
Agent
Craig Barks / Bagshaws LLP

How this decision compares

Decided in 23 days from validation, 16 days faster than Peak District's median of 39 for agricultural works. Approved, as 88% of agricultural works here are.

76%decided within 8 weeks
88%approved
66decided in the last year

Plota live figures for agricultural works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
19 Jun 2026
Statutory expiry
17 Jul 2026