Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory And Bermondsey Campus Site Keetons Road… Data via plota.co.uk

26/AP/0563 - Approval of Details Approved

Proposal

Details of condition 2 'Design details' part d (balcony modesty screens) only, as required by Building V reserved matters approval ref. : 'Application for approval of reserved matters (access, appearance, landscaping, layout and scale) for Building V submitted pursuant to hybrid planning permission ref. dated 12.03.2024 for the redevelopment of the Biscuit Factory and Campus Site. The proposal is for a 10 storey building including 82 residential units (as 9,379sqm (GEA) of residential floorspace - Use Class C3) and 350sqm (GEA) of flexible Class A1/A3/A4/D1 floorspace in two unit at ground floor together with associated cycle parking, landscaping, public realm, plant and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Feb 2026
✓
Validated
26 Feb 2026
✓
Approved
29 Sept 2026

Approved on 29 Sept 2026 · Source Team · Last checked 2 Oct 2026

Associated applications 18

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Site allocation NSP13: Biscuit Factory and Campus. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 311 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 2; Inside the Southwark built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Postcode
SE16 4DG
Received
25 Feb 2026
Validated
26 Feb 2026
Ward
North Bermondsey
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
22 Apr 2026
Decision
AOD - Granted
Decision date
29 Sept 2026
Decision level
Source Team
Agent
DP9

How this decision compares

Decided in 215 days from validation, 160 days slower than Southwark's median of 55 for changes of use. Approved, as 78% of changes of use here are.

56%decided within 8 weeks
78%approved
89decided in the last year

Plota live figures for changes of use decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
22 Apr 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026