Land South Of Lan Fawr, Llanddewi-Brefi, Ceredigion Data via plota.co.uk

A260428 - Full Planning In Progress

Proposal

Erection of a temporary meteorological mast and ancillary structures for measurement of wind and weather data Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
✓
Validated
7 Aug 2026
Decision
Target date was 2 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 108.

Site constraints 4

Nutrient neutrality catchment: Afon Teifi
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special area of conservation about 110 m away: Afon Teifi / River Teifi
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 110 m away: Afon Teifi
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ceredigion
Application type
Full Planning
Received
30 Jun 2026
Validated
7 Aug 2026
Case officer
Show
Target decision
2 Oct 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show
Agent
Turley

Decision outlook

Day 108, past the statutory target. 63% of full applications in Ceredigion are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 10852 days past the 56-day target
45%decided within 8 weeks
82%approved
7%go to committee

Plota live figures for full applications decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →

Consultation & key dates

Statutory expiry
2 Oct 2026