Cwm Clydach Country Park Clydach Tonypandy CF40 2XX Data via plota.co.uk

26/0072/GREG - General Regulations Approved

Proposal

Provision of a 50no. space 'overflow' car park facility with parking bays 2.6m wide x 4.8m long, with a 6.0m wide connecting access road including junction improvements for highway access. Existing car park to be improved comprising of disability new EV parking bays. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Jan 2026
✓
Validated
9 Mar 2026
✓
Approved
17 Apr 2026

Approved on 17 Apr 2026 · Planning and Development Committee · Last checked 25 Jul 2026

Planning committee

Decided by Rhondda Planning and Development Committee on 16 Apr 2026.

Approved

As officers recommended.

  • Officers advised approval because the car park would improve parking without unacceptable harm to amenity, flood risk, ecology or highway safety.
  • Six neighbouring households objected, raising concerns including antisocial behaviour, noise, privacy, drainage, green-space loss and access.
  • The committee approved the application in accordance with the officer recommendation.
Read how the committee decided The proposed parking, site, officer assessment, objections, consultation responses and committee decision.

Source: Plota analysis of Rhondda's committee minutes of 16 Apr 2026.

Documents 25

All documents on the council site ↗

Associated applications 2

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2; Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rhondda - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rhondda
Application type
General Regulations
Postcode
CF40 2XX
Received
28 Jan 2026
Validated
9 Mar 2026
Ward
Cwm Clydach
Case officer
Show
Target decision
4 May 2026
Decision
Approve
Decision date
17 Apr 2026
Decision level
Planning and Development Committee
Applicant
Show

How this decision compares

Decided in 39 days from validation, 18 days faster than Rhondda's median of 57 for commercial and major works. Approved, as 89% of commercial and major works here are.

43%decided within 8 weeks
89%approved
32%go to committee

Plota live figures for commercial and major works decided by Rhondda in the last twelve months, from validation. Rhondda decision record →

Consultation & key dates

Comments by
4 Mar 2026
Committee
16 Apr 2026
Statutory expiry
4 May 2026
Env. assessment
No