PA/26/01957/NC - Listed Building Consent (S8 P&LBC 1990) Registered

Proposal

Internal alterations to the first floor, including the installation of internal partitions and associated doors to create flexible meeting, training and event spaces. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Jan 2027 and 19 Jan 2027, from Tower Hamlets's recent commercial premises.

Site constraints 13

Grade II listed: Toynbee Hall
List entry 1065201 · The pin is inside its outline · 5 more listed buildings within 150 m (1 Grade II*, 4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Historic England ↗
Archaeological priority area: Tower Hamlets APA 2.11
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 760 m away: Thames Tideway Tunnel
The site is 760 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 540 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 44 m away: Wentworth Street; Wider setting of protected view 25A.1 City Hall to the White Tower; Heritage at risk 44 m away: Wentworth Street, Bethnal Green; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 17 m away; Town centre 77 m away: Wentworth Street.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 25 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,610 m² (17,330 sq ft)
Energy ratingA (asset rating 19)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in February 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (S8 P&LBC 1990)
Postcode
E1 6LS
Received
around 16 Nov 2026
Validated
16 Nov 2026
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
11 Jan 2027
Decision level
Delegated
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Tower Hamlets usually decides commercial premises by day 56.

Day 1145 days to the 56-day target
51%decided within 8 weeks
87%approved
184decided in the last year

Plota live figures for commercial premises decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Site or press notice
3 Dec 2026
Statutory expiry
11 Jan 2027
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026