Ground Floor, 21 Commercial Street, London E1 6NE Data via plota.co.uk

PA/25/01596/NC - Full Planning Permission Approved

Proposal

Proposals for: Replacement of existing glazing above the current glazed double doors with new louvres designed to match the existing louvre system and replacement of the existing adjacent louvre with glazing. Installation of fifteen (15) high-level external wall lights, finished in black, providing downward-only illumination via 6W G10 LED bulbs (3000K, 560 lumens). Installation of a new low-level gas pipe with an associated infill panel. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 10 Sept 2025
✓
Consultation
30 Sept 2025
✓
Approved
28 Oct 2025

Approved on 28 Oct 2025 · Delegated · Last checked 22 Nov 2026

Site constraints 12

Archaeological priority area: Tower Hamlets APA 2.11
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 676 m away: Thames Tideway Tunnel
The site is about 676 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 490 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area about 29 m away: Whitechapel High Street; 5 listed buildings within 150 m of the postcode pin; Wider setting of protected view 25A.1 City Hall to the White Tower; Heritage at risk about 37 m away: Whitechapel High Street, Aldgate; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 46 m away: Whitechapel.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1 6NE
Received
around 10 Sept 2025
Validated
10 Sept 2025
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
5 Nov 2025
Decision
Permit
Decision date
28 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
Gordon Young Architects

How this decision compares

Decided in 48 days from validation, 8 days faster than Tower Hamlets's median of 56 for full applications. Approved, as 86% of full applications here are.

60%decided within 8 weeks
86%approved
623decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
22 Oct 2025
Site or press notice
30 Sept 2025
Statutory expiry
5 Nov 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026