Development Site W of Nar Ouse Way King's Lynn Norfolk Data via plota.co.uk

Approved 25/01783/FM
Date received
28 Oct 2025
Date validated
28 Oct 2025

Description

Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works Data via plota.co.uk

Last checked

Planning committee

Decided by Kings Lynn Planning Committee on 27 Jul 2026. Earlier deferred on 1 Jun 2026.

Approved by 9 votes to 1

  • Officers advised approval because the scheme would support active travel, improve connectivity and regenerate brownfield land without identified unacceptable impacts.
  • Supporters highlighted transport and regeneration benefits, while residents and cycling users raised concerns about demand, safety, access and design.
  • The committee approved the application with 9 votes for, 1 against and 3 abstentions.
Read how the committee decided The proposal, site history, officer assessment, consultation responses, objections, debate, vote and decision. Includes the meeting recording

Source: Plota analysis of Kings Lynn's committee minutes of 27 Jul 2026.

Associated applications 3

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 1060 m away: Kings Lynn B Connection Project
The site is about 1060 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Palm Paper 3 CCGT Power station Kings Lynn (decided, about 1144 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI about 232 m away: River Nar SSSI; Inside the King's Lynn built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kings Lynn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Kings Lynn
Planning Authority Score
8.4/10
Excellent
#17 of 296 councils
Relevant to this application:
Change of use

Kings Lynn is one of the fastest councils in England for householder decisions, ranking #20 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Kings Lynn decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #133 of 296
95%
Householder approved
Above avg (90%) #82 of 296
87%
Decided in 8 weeks
Above avg (63%) #20 of 296
27%
Extended time limit
Below avg (41%) #41 of 296
76%
Minor dwellings approved
261 decided (1-9 homes)
85%
Major dwellings approved
26 decided (10+ homes)
89%
Change of use approved
44 decided
1,216
Total decisions
131 refused in the year to March 2026