Old Nar Tidal Sluice Morston Drift King's Lynn Norfolk Data via plota.co.uk

26/01528/DM - Demolition Prior Notification Approved

Proposal

Prior Notification: Demolition of Former River Nar Railway Bridge (Schedule 2, Part 11, Class B) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
✓
Consultation
21 Sept 2026
✓
Approved
20 Oct 2026

Approved on 20 Oct 2026 · Delegated Decision · Last checked 21 Oct 2026

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 119 m away: River Nar SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project about 861 m away: Kings Lynn B Connection Project
The site is about 861 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Palm Paper 3 CCGT Power station Kings Lynn (decided, about 986 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the King's Lynn built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kings Lynn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Kings Lynn
Application type
Demolition Prior Notification
Received
16 Sept 2026
Validated
16 Sept 2026
Ward
South And West Lynn
Parish
King's Lynn
Case officer
Show
Target decision
23 Oct 2026
Decision
DM Prior Approval Req/Grant
Decision date
20 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
DHA Planning

How this decision compares

Decided in 34 days from validation, 20 days faster than Kings Lynn's median of 54 for demolitions. Approved, as 82% of demolitions here are.

86%decided within 8 weeks
82%approved
108decided in the last year

Plota live figures for demolitions decided by Kings Lynn in the last twelve months, from validation. Kings Lynn decision record →

Public comments

No public comments yet.

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15084005
Planning Portal ref
PP-15084005
Consultation
21 Sept 2026
Comments by
12 Oct 2026
Statutory expiry
14 Oct 2026
Env. assessment
No
Kings Lynn
Planning Authority Score
8.4/10
Excellent
#17 of 296 councils
Relevant to this application:
Householder decisions

Kings Lynn is one of the fastest councils in England for householder decisions, ranking #20 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Kings Lynn decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #133 of 296
95%
Householder approved
Above avg (90%) #82 of 296
87%
Decided in 8 weeks
Above avg (63%) #20 of 296
27%
Extended time limit
Below avg (41%) #41 of 296
76%
Minor dwellings approved
261 decided (1-9 homes)
85%
Major dwellings approved
26 decided (10+ homes)
89%
Change of use approved
44 decided
1,216
Total decisions
131 refused in the year to March 2026