Field barn to the east of Fenns Farm, Wetton Road, Butterton, Data via plota.co.uk

NP/SM/0126/0101 - Full Planning Permission REGISTERED: Under Assessment

Proposal

Change of use of field barn to bunk barn with associated external works and parking area Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Feb 2026
Decision
Target date was 21 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 26 Oct 2026; it is now day 272.

The consultation period closed on 26 Oct 2026.

Documents 24

All documents on the council site ↗

Site constraints 5

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
2 listed buildings within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
ST13 7ST
Received
24 Feb 2026
Validated
24 Feb 2026
Parish
Butterton
Case officer
Show
Applicant
Show

Decision outlook

Day 272, past the statutory target. 95% of agricultural works in Peak District are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 272216 days past the 56-day target
76%decided within 8 weeks
88%approved
66decided in the last year

Plota live figures for agricultural works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
24 Feb 2026
Comments by
26 Oct 2026
Statutory expiry
20 Apr 2026