10 Cabot Square, London, E14 5AB Data via plota.co.uk

PA/26/00133/A1 - Full Planning Permission Registered

Proposal

Part demolition of existing building structure, replacement of building fa�ade, extension at roof level, provision of external terraces and internal changes to enable deep retrofit and refurbishment of the existing office building. Works to provide additional floorspace, with office (Use Class E(g)) floorspace on upper floors and flexible commercial, business and service (Use Class E) and Sui Generis (drinking establishment with expanded food offer; and leisure games venue with associated bar and food offer) floorspace on lower floors. Ancillary works to include replacement plant, reconfiguration of existing servicing and parking space, landscaping, interface works with existing public realm and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
22 Jan 2026
Consultation
2 Feb 2026
Decision
Expected by 23 May 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 12 Sept 2026; it is now day 233. The consultation period closed on 4 Mar 2026.

Documents 134

Statements & assessments 34

PDF ECOLOGY AND BIODIVERSITY ? INTERIM REVIEW REPORT Report · 23 Mar 2026 View ↗ PDF WIND MICROCLIMATE ASSESSMENT REVIEW INTERIM REVIEW REPORT Report · 23 Mar 2026 View ↗ PDF AIR QUALITY ASSESSMENT Report · 22 Jan 2026 View ↗ PDF ENERGY ASSESSMENT AND OVERHEATING MITIGATION Report · 22 Jan 2026 View ↗ PDF FIRE STATEMENT Report · 22 Jan 2026 View ↗ PDF Flood Risk Assessment Flood Risk Assessment · 22 Jan 2026 View ↗ PDF SURFACE WATER DRAINAGE STRATEGY Report · 22 Jan 2026 View ↗ PDF Transport Statement Transport Statement · 22 Jan 2026 View ↗ PDF PART 1 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 2 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 3 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 4 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 5 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 6 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 7 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 8 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 9 Design & Access Statement · 22 Jan 2026 View ↗ PDF PART 10 Design & Access Statement · 22 Jan 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 2 Report · 22 Jan 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 3 Report · 22 Jan 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 4 Report · 22 Jan 2026 View ↗ PDF FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 1 Report · 22 Jan 2026 View ↗ PDF FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 2 Report · 22 Jan 2026 View ↗ PDF HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 1 Report · 22 Jan 2026 View ↗ PDF HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 2 Report · 22 Jan 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 1 Report · 22 Jan 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 2 Report · 22 Jan 2026 View ↗ PDF ECOLOGICAL APPRAISAL AND BIODIVERSITY NET GAIN STATEMENT Report · 22 Jan 2026 View ↗ PDF LBTH BIODIVERSITY NET GAIN CHECKLIST Correspondence · 22 Jan 2026 View ↗ PDF STATUTORY BIODIVERSITY METRIC Correspondence · 22 Jan 2026 View ↗ PDF Planning Statement Planning Statement · 22 Jan 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 1 Report · 22 Jan 2026 View ↗ PDF SUSTAINABILITY STATEMENT Report · 22 Jan 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT Report · 22 Jan 2026 View ↗

Plans & drawings 86

PDF FC2003-HOW-DA-05-L02-DR-0004200 GA PLAN L02 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L00-DR-0000500 PROPOSED GA PLAN GROUND FLOOR Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L00-DR-0002300 EXISTING GA PLAN GROUND FLOOR Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L00-DR-0003900 GA PLAN GROUND FLOOR - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L01-DR-0000700 PROPOSED GA PLAN L01 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L01-DR-0002500 EXISTING GA PLAN L01 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L01-DR-0004100 GA PLAN L01 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L02-DR-0000800 PROPOSED GA PLAN L02 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L02-DR-0002600 EXISTING GA PLAN L02 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-ROF-DR-0002100 PROPOSED GA ROOF PLAN Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-ROF-DR-0003700 EXISTING GA ROOF PLAN Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-ROF-DR-0005300 GA ROOF PLAN - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L03-DR-0000900 PROPOSED GA PLAN L03 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L03-DR-0002700 EXISTING GA PLAN L03 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L03-DR-0004300 GA PLAN L03 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L04-DR-0001000 PROPOSED GA PLAN L04 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L04-DR-0002800 EXISTING GA PLAN L04 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L04-DR-0004400 GA PLAN L04 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L05-DR-0001100 PROPOSED GA PLAN L05 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L05-DR-0002900 EXISTING GA PLAN L05 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L05-DR-0004500 GA PLAN L05 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L06-DR-0001200 PROPOSED GA PLAN L06 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L06-DR-0003000 EXISTING GA PLAN L06 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L06-DR-0004600 GA PLAN L06 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L07-DR-0001300 PROPOSED GA PLAN L07 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L07-DR-0003100 EXISTING GA PLAN L07 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L07-DR-0004700 GA PLAN L07 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L08-DR-0001400 PROPOSED GA PLAN L08 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L08-DR-0003200 EXISTING GA PLAN L08 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L08-DR-0004800 GA PLAN L08 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L09-DR-0001500 PROPOSED GA PLAN L09 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L09-DR-0003300 EXISTING GA PLAN L09 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L09-DR-0004900 GA PLAN L09 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L10-DR-0001600 PROPOSED GA PLAN L10 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L10-DR-0003400 EXISTING GA PLAN L10 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L10-DR-0005000 GA PLAN L10 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L11-DR-0001700 PROPOSED GA PLAN L11 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L11-DR-0003500 EXISTING GA PLAN L11 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L11-DR-0005100 GA PLAN L11 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L12-DR-0001800 PROPOSED GA PLAN L12 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L12-DR-0003600 EXISTING GA PLAN L12 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L12-DR-0005200 GA PLAN L12 - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L13-DR-0001900 PROPOSED GA PLAN L13 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-L14-DR-0002000 PROPOSED GA PLAN L14 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LB1-DR-0000400 PROPOSED GA PLAN LOWER GROUND FLOOR Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LB1-DR-0002200 EXISTING GA PLAN LOWER GROUND FLOOR Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LB1-DR-0003800 GA PLAN LOWER GROUND FLOOR - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0000100 SITE LOCATION PLAN Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0000200 EXISTING SITE PLAN Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0000300 PROPOSED SITE PLAN Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005400 PROPOSED GA ELEVATION NORTH Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005500 PROPOSED GA ELEVATION EAST Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005600 PROPOSED GA ELEVATION SOUTH Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005700 PROPOSED GA ELEVATION WEST Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005800 EXISTING GA ELEVATION NORTH Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0005900 EXISTING GA ELEVATION EAST Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006000 EXISTING GA ELEVATION SOUTH Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006100 EXISTING GA ELEVATION WEST Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006200 GA ELEVATION NORTH - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006300 GA ELEVATION EAST - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006400 GA ELEVATION SOUTH - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006500 GA ELEVATION WEST - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006600 PROPOSED GA SECTION AA Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006700 PROPOSED GA SECTION BB Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006800 EXISTING GA SECTION AA Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0006900 EXISTING GA SECTION BB Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0007000 GA SECTION AA - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-0007100 GA SECTION BB - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-00072 PROPOSED BAY STUDY - TYPICAL OFFICE FLOOR Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-LXX-DR-00073 RETAIL FRONTAGE Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-MZ1-DR-0000600 PROPOSED GA PLAN MEZZANINE Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-MZ1-DR-0002400 EXISTING GA PLAN MEZZANINE Current Plan · 22 Jan 2026 View ↗ PDF FC2003-HOW-DA-05-MZ1-DR-0004000 GA PLAN MEZZANINE - DEMOLITION Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L14-DR-90018 GREEN ROOF GA L14 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L02-DR-90011 LANDSCAPE TERRACE GA L02 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L03-DR-90012 LANDSCAPE TERRACE GA L03 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L05-DR-90013 LANDSCAPE TERRACE GA L05 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L08-DR-90014 LANDSCAPE TERRACE GA L08 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L09-DR-90015 LANDSCAPE TERRACE GA L09 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L11-DR-90016 LANDSCAPE TERRACE GA L11 Current Plan · 22 Jan 2026 View ↗ PDF FC2003-BDP-LA-25-L12-DR-90017 LANDSCAPE TERRACE GA L12 Current Plan · 22 Jan 2026 View ↗ PDF Drawing/Document Issue Register Drawing/Document Issue Register · 22 Jan 2026 View ↗ PDF DELIVERY AND SERVICING MANAGEMENT PLAN Report · 22 Jan 2026 View ↗ PDF DUST MANAGEMENT PLAN Report · 22 Jan 2026 View ↗ PDF HABITAT MAP Current Plan · 22 Jan 2026 View ↗ PDF CONSTRUCTION ENVIRONMENTAL LOGISTICS MANAGEMENT PLAN Report · 22 Jan 2026 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Canary Wharf. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Canary Wharf
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E14 5AB
Received
22 Jan 2026
Validated
22 Jan 2026
Ward
Canary Wharf
Case officer
Show
Target decision
23 May 2026
Decision level
Delegated
Applicant
Show
Agent
Quod

Decision outlook

Day 233, past the statutory target. 94% of utility and infrastructure works in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Sept 2026.

Day 233177 days past the 56-day target
79%decided within 8 weeks
85%approved
34decided in the last year

Plota live figures for utility and infrastructure works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
2 Feb 2026
Consultation
2 Feb 2026
Comments by
4 Mar 2026
Site or press notice
5 Feb 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026