3 Gallions Close, Barking, Barking And Dagenham, IG11 0JD Data via plota.co.uk

25/01105/VAR - Removal or Variation of a Condition following Grant of Planning Permission Approved

Proposal

Section 73 Application to vary Condition Nos.: 2 (Approved Plans), 3 (Accessible Housing), 5 (Energy Statement), 6 (Flood Risk Assessment), 7 (Water Efficiency), 8 (Blue Badge Parking Spaces), 9 (Site Waste Management Plan), 12 (Archaeology), 13 (Piling Method Statement), 17 (Air Quality and Dust Management Plan), 19 (Fire Evacuation Lift), 21 (Cycle Parking), 25 (Public Realm, Landscaping & Play Space), 31 (Odour), 33 (Urban Greening Factor) attached to planning consent dated 21/02/2025. FOR INFORMATION ONLY: For the purposes of public consultation, the following additional information describing the proposal is provided (this does not form part of the formal description of development set out above): Amendments to and reconfiguration of building massing, increase unit numbers (+29 units), increase affordable housing provision, amend unit mix, remove podium level, increase blue badge car parking (+2 spaces), reconfigure ground floor arrangement, increase communal amenity space, provision of additional commercial units, a nursery and a community space, amended materiality, amendments to meet latest building and fire regulations, amendments to implementation timeframes. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2025
✓
Approved
14 May 2026

Approved on 14 May 2026 · Last checked 18 Oct 2026

Planning committee

Decided by Barking and Dagenham Planning Committee on 16 Dec 2025.

Approved

As officers recommended.

  • Officers advised approval because the amended scheme would provide more homes, at least 35% social rent housing and acceptable design and amenity outcomes.
  • Objectors raised concerns about parking, congestion, construction impacts, privacy, play space and reduced financial contributions.
  • The committee approved the application subject to a legal agreement and conditions, with authority to refuse or extend the deadline if the agreement was not completed.
Read how the committee decided The proposed changes, site background, officers’ assessment, objections, committee discussion and decision.

Source: Plota analysis of Barking and Dagenham's committee minutes of 16 Dec 2025.

Documents 93

Statements & assessments 24

PDF Facade Design - Colour Narrative Design and Access Statement · 15 Oct 2025 View ↗ PDF Supplemental Daylight and Sunlight Assessment Daylight / Sunlight Assessment · 4 Aug 2025 View ↗ PDF BNG Metric Spreadsheet Biodiversity / Habitat Report · 1 Aug 2025 View ↗ PDF Whole Life-Cycle Carbon Spreadsheet Energy / Sustainability Assessment · 1 Aug 2025 View ↗ PDF Planning Statement Planning Statement · 1 Aug 2025 View ↗ PDF Biodiversity Net Gain Plan Biodiversity / Habitat Report · 1 Aug 2025 View ↗ PDF Energy Statement Energy / Sustainability Assessment · 1 Aug 2025 View ↗ PDF Fire Statement Other · 1 Aug 2025 View ↗ PDF Internal Daylight & Sunlight Assessment Daylight / Sunlight Assessment · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 7/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 6/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 5/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 4/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 3/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 2/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Design and Access Statement Part 1/7 Design and Access Statement · 1 Aug 2025 View ↗ PDF Whole Life-Cycle Carbon Assessment Energy / Sustainability Assessment · 1 Aug 2025 View ↗ PDF Circular Economy Statement Other · 1 Aug 2025 View ↗ PDF Noise Impact Assessment Noise/Acoustic Assessment · 1 Aug 2025 View ↗ PDF Flood Risk Assessment Part 2/2 Flood Risk Assessment · 1 Aug 2025 View ↗ PDF Flood Risk Assessment Part 1/2 Flood Risk Assessment · 1 Aug 2025 View ↗ PDF Transport Assessment Transport Assessment / Statement · 1 Aug 2025 View ↗ PDF Air Quality Assessment Other · 1 Aug 2025 View ↗ PDF Wind Microclimate Assessment Microclimate/Wind Assessment · 1 Aug 2025 View ↗

Plans & drawings 58

PDF Proposed Ground Floor Plan - Existing Context Plans / Drawings · 2 Dec 2025 View ↗ PDF Servicing Strategy Plan (submitted 18/09/2025) Plans / Drawings · 18 Nov 2025 View ↗ PDF (superseded) Proposed Ground Floor Plan - Existing Context Plans / Drawings · 17 Nov 2025 View ↗ PDF Proposed Highway Arrangement - Existing Streets Plans / Drawings · 17 Nov 2025 View ↗ PDF Affordable Housing Allocations (submitted 07/11/2025) Plans / Drawings · 17 Nov 2025 View ↗ PDF Roof Terraces Landscaping Plan Plans / Drawings · 11 Nov 2025 View ↗ PDF Ground Floor Landscaping Plan Plans / Drawings · 11 Nov 2025 View ↗ PDF Urban Greening Factor (UGF) Plan Plans / Drawings · 11 Nov 2025 View ↗ PDF Amenity Space Calculations Plans / Drawings · 11 Nov 2025 View ↗ PDF Proposed Ground Floor Plan - Future Context (FOR INFO ONLY) Plans / Drawings · 28 Oct 2025 View ↗ PDF (superseded) Proposed Ground Floor Plan - Existing Context Plans / Drawings · 28 Oct 2025 View ↗ PDF Proposed Courtyard West Section/Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Courtyard East Section/Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Courtyard North Section/Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed South Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed West Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed East Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed North Elevation Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Roof Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Fourteenth - Fifteenth Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Eighth - Thirteenth Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Seventh Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Sixth Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed Second-Fifth Floor Plans Plans / Drawings · 15 Oct 2025 View ↗ PDF Proposed First Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF (superseded) Proposed Ground Floor Plan - Existing Context Plans / Drawings · 15 Oct 2025 View ↗ PDF (superseded) Proposed Ground Floor Plan - Future Context Plans / Drawings · 15 Oct 2025 View ↗ PDF Demolition Ground Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Existing Ground Floor Plan Plans / Drawings · 15 Oct 2025 View ↗ PDF Urban Greening Factor Option A Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Roof Garden Masterplan- Levels 6,7, and 8-13 Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Copy of/ Version B Landscape Masterplan- Ground Floor Plans / Drawings · 1 Aug 2025 View ↗ PDF Drawings Issue Summary Other · 1 Aug 2025 View ↗ PDF (superseded) Landscape Masterplan- Level 6 and 7 Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Landscape Masterplan- Ground Floor Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Roof Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF Vehicle Swept Path Analysis for Refuse Vehicles Plans / Drawings · 1 Aug 2025 View ↗ PDF Proposed Highway Arrangement Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF Proposed Ground Floor Plan- Future Context Plans / Drawings · 1 Aug 2025 View ↗ PDF Demolition Elevations Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Demolition Ground Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF Existing Elevations Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Existing Ground Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF Site Location Plan Site Location Plan · 1 Aug 2025 View ↗ PDF (superseded) Proposed Courtyard West Section/Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Courtyard East Section/Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Courtyard North Section/Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed South Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed West Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed East Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Fourteenth - Fifteenth Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed North Elevation Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Eighth- Thirteenth Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Seventh Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Sixth Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Second-Fifth Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed Ground Floor Plan Plans / Drawings · 1 Aug 2025 View ↗ PDF (superseded) Proposed First Floor Plan Plans / Drawings · 1 Aug 2025 View ↗

All documents on the council site ↗

Associated applications 12

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 728 m away: Thames Tideway Tunnel
The site is 728 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 983 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Local nature reserve 395 m away: Ripple; Inside the Barking and Dagenham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £4,750,000 in October 2019. Other property, freehold.

22 October 2019£4,750,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area308 m² (3,315 sq ft)
Energy ratingC (asset rating 66)
UseB2 to B7 General Industrial and Special Industrial Groups
HeatingUnconditioned

From the energy performance certificate lodged in August 2021, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Removal or Variation of a Condition following Grant of Planning Permission
Postcode
IG11 0JD
Received
31 Jul 2025
Validated
31 Jul 2025
Ward
Barking Riverside
Case officer
Show
Target decision
14 May 2026
Decision
Approved Subject To Legal Agreement
Decision date
14 May 2026
Applicant
Show
Agent
Hybrid Planning & Development
Freehold owner
Show

Consultation & key dates

Statutory expiry
14 May 2026
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 councils
Relevant to this application:
Major dwellings

Barking and Dagenham is one of the fastest councils in England for householder decisions, ranking #9 out of 296. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.