421 Bastable Avenue, Barking, Barking And Dagenham, IG11 0QN Data via plota.co.uk

26/01313/NONMAT - Non-Material Amendment following Grant of Planning Permission Valid/Complete

Proposal

Non-material amendment to planning permission 26/00025/HSE dated 18/02/2026 comprising of changing the rear extension roof from a monopitch roof to a flat roof Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Validated
1 Oct 2026
✓
Received
around 6 Oct 2026
Decision
Expected by 29 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 29 Oct 2026.

Associated applications 3

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve about 247 m away: Ripple
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project about 1321 m away: Thames Tideway Tunnel; Inside the Barking and Dagenham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £69,995 in July 1999. Terraced house, freehold.

16 July 1999£69,995

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area77 m² (829 sq ft)
Energy ratingC (69 out of 100), could reach B
PropertyMid-terrace house, 5 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsSystem built, as built, no insulation (assumed)

From the energy performance certificate lodged in November 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment following Grant of Planning Permission
Postcode
IG11 0QN
Received
around 6 Oct 2026
Validated
1 Oct 2026
Ward
Barking Riverside
Case officer
Show
Target decision
29 Oct 2026
Applicant
Show

Consultation & key dates

Statutory expiry
29 Oct 2026
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 councils
Relevant to this application:
Householder decisions

Barking and Dagenham is one of the fastest councils in England for householder decisions, ranking #9 out of 296. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.