6A Dalmeny Street Edinburgh EH6 8RA Data via plota.co.uk

26/02261/FULSTL - Planning Permission STL Refused

Proposal

Change of use from a residential flat to short term let. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 May 2026
✓
Validated
28 May 2026
✗
Refused
2 Jul 2026
Appeal
Not lodged

Refused on 2 Jul 2026 · Local Delegated Decision · Last checked 6 Jul 2026

Site constraints 2

Leith conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
15 listed buildings within 150 m of the postcode pin
Nearest: Ukrainain Catholic Church Of St Andrew, 24 Dalmeny Street, Edinburgh, Grade B, about 49 m from the postcode pin · 1 Grade A, 4 Grade B, 10 Grade C
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 15 with distances
Historic Environment Scotland ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Edinburgh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Edinburgh
Application type
Planning Permission STL
Postcode
EH6 8RA
Received
26 May 2026
Validated
28 May 2026
Ward
Leith Walk
Parish
Leith Central
Case officer
Show
Target decision
27 Jul 2026
Decision
Refused
Decision date
2 Jul 2026
Decision level
Local Delegated Decision
Applicant
Show
Agent
Johnston - Harris Architects.

How this decision compares

Decided in 35 days from validation, 42 days faster than Edinburgh's median of 77 for changes of use. Refused, as 49% of changes of use here are.

27%decided within 8 weeks
51%approved
13%go to committee

Plota live figures for changes of use decided by Edinburgh in the last twelve months, from validation. Edinburgh decision record →

Consultation & key dates

Comments by
26 Jun 2026
Statutory expiry
27 Jul 2026
Env. assessment
No