45 Mill Hill Road Acton W3 8JE Data via plota.co.uk

262148PTC - Works to a tree Conservation Area Approved

Proposal

T1 Beech x3 - Reduce and reshape by approx. 3m Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 May 2026
✓
Approved
26 Jun 2026

Approved on 26 Jun 2026 · Last checked 5 Jul 2026

Site constraints 6

Mill Hill Park conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 989 m away: Thames Tideway Tunnel
The site is about 989 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Town centre about 17 m away: Acton.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £610,000 in April 2007. Semi-detached house, freehold.

4 April 2007£610,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Works to a tree Conservation Area
Postcode
W3 8JE
Received
27 May 2026
Validated
27 May 2026
Ward
South Acton
Case officer
Show
Target decision
8 Jul 2026
Decision
No Objection
Decision date
26 Jun 2026
Applicant
Show
Agent
Roffey and Wootton Trees

How this decision compares

Decided in 30 days from validation, 6 days slower than Ealing's median of 24 for tree and landscaping works. Approved, as 98% of tree and landscaping works here are.

98%decided within 8 weeks
98%approved
325decided in the last year

Plota live figures for tree and landscaping works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Consultation & key dates

Alt. reference
PP-14965150
Planning Portal ref
PP-14965150
Statutory expiry
8 Jul 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Other decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.