The Steyne Estate Steyne Road W3 9NF Data via plota.co.uk

264027DV - Deed of Variation S106 Awaiting decision

Proposal

Modification of Planning Obligation for planning permission ref: dated 09.02.2023 to amend the relevant Schedule 2 wording so that the three-month affordability restriction period runs from the commencement of marketing of the development/shared ownership units, rather than from the date each shared ownership unit is ready for occupation Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
27 Oct 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 22 Dec 2026.

Associated applications 4

Site constraints 7

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Acton
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 980 m away: Thames Tideway Tunnel
The site is 980 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area 83 m away: Acton Town Centre; Inside the Ealing built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Heritage at risk 83 m away: Acton Town Centre, Acton.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area79 m² (850 sq ft)
Energy ratingD (66 out of 100)
PropertyMid-terrace flat, 4 habitable rooms
Built1967 to 1975
HeatingCommunity scheme
WallsSystem built, as built, no insulation (assumed)

From the energy performance certificate lodged in October 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Deed of Variation S106
Postcode
W3 9NF
Received
27 Oct 2026
Validated
27 Oct 2026
Target decision
22 Dec 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
22 Dec 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.