Little Newcourt Axminster Road Musbury EX13 8AZ Data via plota.co.uk

26/0838/FUL - Full Application Approved

Proposal

2 conservatories replaced with 2 new single storey extensions Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Apr 2026
✓
Approved
29 May 2026

Approved on 29 May 2026 · Delegated Decision · Last checked 6 Jul 2026

Site constraints 8

Nutrient neutrality catchment: River Axe SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Musbury conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; 2 listed buildings within 150 m of the postcode pin; Inside the Musbury built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £385,000 in March 2025. Detached house, freehold.

14 March 2025£385,000
19 February 2021£325,000
24 June 2003£185,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX13 8AZ
Received
29 Apr 2026
Validated
29 Apr 2026
Ward
Newbridges
Parish
Musbury
Decision
Approval with conditions
Decision date
29 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Ed Hollway Architect

How this decision compares

Decided in 30 days from validation, 19 days faster than East Devon's median of 49 for extensions. Approved, as 95% of extensions here are.

73%decided within 8 weeks
95%approved
651decided in the last year

Plota live figures for extensions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Consultation & key dates

Alt. reference
PP-14895190
Planning Portal ref
PP-14895190
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 overall
Relevant to this application:
Householder decisions

East Devon is #103 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.