Musbury Garage, Spar Marlborough Road Musbury Devon EX13 8AX Data via plota.co.uk

26/1841/DOC - Discharge of Condition Awaiting decision

Proposal

Discharge of condition for : Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting). Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
10 Sept 2026
Decision
Expected by 5 Nov 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 5 Nov 2026.

Associated applications 2

  • Part of

    VariationApprovedcouncil archive

    Conditions 3, 4, 7 awaiting decision

    • ConditionsDischarge of condition - Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting).This application26/1841/DOC

Site constraints 7

Nutrient neutrality catchment: River Axe SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area 21 m away: Musbury
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
10 listed buildings within 150 m
Nearest: Malvern House, Grade II, 54 m away · 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Also on the record
Inside the Musbury built-up area; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Discharge of Condition
Postcode
EX13 8AX
Received
10 Sept 2026
Validated
10 Sept 2026
Applicant
Show
Agent
Myers CDM Limited

Public comments

No public comments yet.

Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15204879
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026