Rising Sun Hotel, 138 Greenford Road, Sudbury, Harrow, HA1 3QL Data via plota.co.uk

PL/0797/26 - Full Planning Application Approved at committee

Approved at planning committee on 23 September 2026, subject to a legal agreement. The council issues its decision notice once the agreement is signed.

Proposal

Change of use from Restaurant and Hotel (Use Class Sui Generis) to Mixed use Commercial and 6 Residential flats (Use Class E and C3); Retention and restoration of front and side facades; Single and two storey side extension; Single and two storey rear extension; Alterations and extension to roof to form end gable; Side dormers with Juliette balconies, Front, side and rear dormers; First floor terraces to side and rear with privacy screens; Replacement windows to front and side elevations; Installation of ventilation louvres to ground floor side elevation; Installation of doors to ground floor side elevation; External alterations; Cycle and waste storage; Parking to front; Partial demolition and redevelopment to create two new dwelling houses to the rear; Solar panels to rear roof slopes; Associated vehicle access, private amenity space, parking and landscaping; Cycle and waste storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Mar 2026
✓
Validated
8 Apr 2026
✓
Committee
23 Sept 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 229.

Planning committee

Decided by Harrow Planning Committee on 23 Sept 2026. The council has not yet issued its decision notice.

Approved unanimously

As officers recommended.

  • Officers advised approval because the scheme would provide housing and restore the damaged locally listed building, subject to conditions and a legal agreement.
  • Residents objected over parking, traffic, amenity, design, employment and local services, while consultees raised matters including drainage and landscaping.
  • The committee unanimously granted permission subject to the legal agreement and the tabled addendum.
Read how the committee decided The proposal, site history, officers’ assessment, public views, speakers and committee decision. Includes the meeting recording

Source: Plota analysis of Harrow's committee minutes of 23 Sept 2026.

Documents 25

All documents on the council site ↗

Site constraints 6

Air quality management area: Harrow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 270 m away: Grove Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
1 listed building within 150 m
Nearest: St Andrews Church Institute, Grade II, 53 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Inside the Harrow built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Metropolitan Open Land 26 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Harrow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harrow
Application type
Full Planning Application
Postcode
HA1 3QL
Received
23 Mar 2026
Validated
8 Apr 2026
Ward
Harrow on the Hill
Case officer
Show
Target decision
8 Jul 2026
Decision level
Schedule 2 - Committee
Applicant
Show
Agent
hgh Consulting

Decision outlook

Day 229, past the statutory target. 72% of changes of use in Harrow are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 229173 days past the 56-day target
59%decided within 8 weeks
39%approved
266decided in the last year

Plota live figures for changes of use decided by Harrow in the last twelve months, from validation. Harrow decision record →

Consultation & key dates

Statutory expiry
8 Jul 2026
Harrow
Planning Authority Score
4.9/10
Below average
#153 of 296 overall
Relevant to this application:
Change of use

Harrow is #115 of 296 councils on householder decision speed. Harrow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Harrow decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #273 of 296
83%
Householder approved
Below avg (90%) #261 of 296
71%
Decided in 8 weeks
Above avg (63%) #115 of 296
33%
Extended time limit
Below avg (41%) #77 of 296
44%
Minor dwellings approved
133 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
38%
Change of use approved
26 decided
1,330
Total decisions
298 refused in the year to March 2026