Rising Sun Hotel, 138 Greenford Road, Sudbury, Harrow, HA1 3QL Data via plota.co.uk

PL/3211/25 - Full Planning Application Approved

Proposal

Electrical substation and Low Voltage Pillar to support electric vehicle charge points; 5 x bollards; alterations and relining of parking bays Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Dec 2025
✓
Validated
18 Dec 2025
✓
Approved
12 Feb 2026

Approved on 12 Feb 2026 · Delegated decision · Last checked 19 Oct 2026

Site constraints 6

Air quality management area: Harrow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 270 m away: Grove Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
1 listed building within 150 m
Nearest: St Andrews Church Institute, Grade II, 53 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Inside the Harrow built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Metropolitan Open Land 26 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Harrow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harrow
Application type
Full Planning Application
Postcode
HA1 3QL
Received
10 Dec 2025
Validated
18 Dec 2025
Ward
Harrow on the Hill
Case officer
Show
Target decision
12 Feb 2026
Decision
Grant Conditionally
Decision date
12 Feb 2026
Decision level
Delegated decision
Applicant
Show
Agent
Factor 9 Design

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 79% of utility and infrastructure works here are.

74%decided within 8 weeks
79%approved
55decided in the last year

Plota live figures for utility and infrastructure works decided by Harrow in the last twelve months, from validation. Harrow decision record →

Consultation & key dates

Statutory expiry
12 Feb 2026
Harrow
Planning Authority Score
4.9/10
Below average
#153 of 296 overall
Relevant to this application:
Householder decisions

Harrow is #115 of 296 councils on householder decision speed. Harrow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Harrow decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #273 of 296
83%
Householder approved
Below avg (90%) #261 of 296
71%
Decided in 8 weeks
Above avg (63%) #115 of 296
33%
Extended time limit
Below avg (41%) #77 of 296
44%
Minor dwellings approved
133 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
38%
Change of use approved
26 decided
1,330
Total decisions
298 refused in the year to March 2026