203A, 203B And 203C Sudbury Heights Avenue Greenford UB6 0LR Data via plota.co.uk
Proposal
Conversion to three flats (retrospective), along with proposed modifications to layout of existing three flats; proposed front and side porch extensions (following demolition of existing porches); rear roof extension Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 22 Nov 2026, from Ealing's recent extensions.
Documents 7
Statements & assessments 1
Plans & drawings 1
Application forms 1
Consultation & comments 1
Site constraints 3
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in September 2022, the latest held for this property. The building may have changed since. View the certificate
Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
21 Sudbury Heights Avenue Greenford UB6 0ND
Alteration of roof from hip to gable end; rear roof extension and installation o...
17 Sudbury Heights Avenue Greenford UB6 0ND
Rear roof extension, and installation of three roof lights to front and one to t...
19 Sudbury Heights Avenue Greenford UB6 0ND
Alteration of roof from hip to gable end; rear roof extension and installation o...
Nearby new applications
Sudbury Hill Post Office, 147 Greenford Road, Sudbury, Harrow, HA1 3QN
Installation of an InPost parcel locker to front
11 Elms Lane, Wembley, HA0 2NX
Trimming overhanging branches to boundary line. Removing dangerous dead branches...
83 Bourne View Greenford UB6 7QS
Single storey rear wraparound and side extension, two storey rear and side exten...
1 Robin Hood Way Greenford UB6 7QN
Construction of two-storey, 3-bedroom detached dwellinghouse (Use Class C3), wit...
73 Ennismore Avenue Greenford UB6 0LQ
Single storey (Max 6m deep and Max 3.14m high) rear extension (following the dem...
42 Medway Gardens, Wembley, HA0 2RJ
Variation of condition 2, development built in accordance with approved drawings...
Important details
Decision outlook
Day 10 of the 56-day target. Ealing usually decides extensions by day 54.
Plota live figures for extensions decided by Ealing in the last twelve months, from validation. Ealing decision record →
Public comments
No public comments yet.
Last counted 6 Oct 2026
Consultation & key dates
- Alt. reference
- PP-15150962
- Planning Portal ref
- PP-15150962
- Consultation
- 5 Oct 2026
- Comments by
- 29 Oct 2026
- Statutory expiry
- 24 Nov 2026
- Env. assessment
- No
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
203A, 203B And 203C Sudbury Heights Avenue Greenford UB6 0LR
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

Comments are open until 29 Oct 2026