DC/26/0378/FUL - Full Application Approved

Proposal

Construction of a covered manage (indoor riding arena) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jan 2026
✓
Approved
10 Apr 2026

Approved on 10 Apr 2026 · Delegated Decision · Last checked 12 Jul 2026

Associated applications 2

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 1006 m away: The Sizewell C Project
The site is 1006 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Suffolk Water Recycling Transfer and Storage (at pre-application, 211 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
IP17 2QN
Received
29 Jan 2026
Validated
29 Jan 2026
Ward
Kelsale And Yoxford
Parish
Kelsale Cum Carlton
Case officer
Show
Target decision
26 Mar 2026
Decision
Application Permitted
Decision date
10 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Planning Direct

How this decision compares

Decided in 71 days from validation, 15 days slower than East Suffolk's median of 56 for agricultural works. Approved, as 65% of agricultural works here are.

57%decided within 8 weeks
65%approved
75decided in the last year

Plota live figures for agricultural works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Consultation & key dates

Statutory expiry
26 Mar 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Householder decisions

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026