CTIL_115032 VMO2_37149 Saxmundham Treatment Works Rendham Road Saxmundham Suffolk IP17 1BX Data via plota.co.uk

DC/26/3609/CON - Other Consultation Responded

Proposal

Consultation - The proposed removal of 1no existing 300mm dish to be replaced with 1no new 300mm multi-band dish mounted on existing standoff bracket and support pole on the rooftop. Proposed link equipment to be installed within existing equipment cabinet and all ancillary development thereto Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
Decision
Expected by 4 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Nov 2026 and 8 Dec 2026, from recent other across the UK.

Site constraints 3

National infrastructure project 339 m away: The Sizewell C Project
The site is 339 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sea Link (awaiting the Secretary of State's decision, 966 m); Suffolk Water Recycling Transfer and Storage (at pre-application, the site is inside its boundary); LionLink Interconnector (at pre-application, 966 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Saxmundham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Other Consultation
Postcode
IP17 1BX
Received
14 Oct 2026
Validated
14 Oct 2026
Ward
Saxmundham
Parish
Saxmundham
Case officer
Show
Target decision
4 Nov 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Councils usually decide other by day 50.

Day 1442 days to the 56-day target
71%decided within 8 weeks
95%approved
2,204decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in East Suffolk to go on. East Suffolk decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Nov 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Householder decisions

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026