Adjacent 36 Lorne Street Easington Lane Houghton-le-Spring Data via plota.co.uk

Proposal

Erection of a two-storey residential dwelling with detached garage and stable block, new access and associated landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Apr 2026
✓
Validated
20 Aug 2026
✓
Consultation
20 Aug 2026
Decision
Expected by 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Oct 2026, from Sunderland's recent extensions.

The consultation period closed on 22 Sept 2026.

Documents 19

All documents on the council site ↗

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Priority habitat 20 m away: Deciduous woodland; National infrastructure project 1206 m away: Morven Hawthorn Pit Grid Connection Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sunderland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sunderland
Application type
Full Application
Received
24 Apr 2026
Validated
20 Aug 2026
Ward
Hetton
Parish
Hetton Town Council
Case officer
Show
Target decision
15 Oct 2026
Applicant
Show
Agent
A.M.Watt Design

Decision outlook

Day 50 of the 56-day target. Sunderland usually decides extensions by day 51.

Day 506 days to the 56-day target
78%decided within 8 weeks
93%approved
233decided in the last year

Plota live figures for extensions decided by Sunderland in the last twelve months, from validation. Sunderland decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14885930
Planning Portal ref
PP-14885930
Neighbours
20 Aug 2026
Consultation
20 Aug 2026
Comments by
22 Sept 2026
Site or press notice
1 Sept 2026
Statutory expiry
15 Oct 2026
Env. assessment
No
Sunderland
Planning Authority Score
6.2/10
Average
#94 of 296 councils
Relevant to this application:
Householder decisions

Sunderland ranks #99 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sunderland decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #101 of 296
94%
Householder approved
Above avg (90%) #119 of 296
73%
Decided in 8 weeks
Above avg (63%) #99 of 296
37%
Extended time limit
Below avg (41%) #123 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
84%
Major dwellings approved
19 decided (10+ homes)
66%
Change of use approved
58 decided
581
Total decisions
54 refused in the year to March 2026