One dwelling conversion at Barn at Sitterlow Farm Parwich
Summary of planning committee decision
Decided by Peak District Planning Committee on 5 Sept 2025.
What was proposed
The application sought to convert and alter a former agricultural building into one market dwelling, with roof, openings, amenity space and parking changes.
“Planning permission is sought for the conversion and alteration of a former agricultural building to form a market dwelling.”
“The proposed alterations to the building comprise the insertion of windows and doors into existing openings, the re-opening of previously blocked up openings in the western elevation and the insertion of 3 No. rooflights into both the eastern and western facing roof slopes to serve the first floor accommodation.”
Officer report
The site and surroundings
The barn is about one kilometre south of Parwich in open countryside, separate from the farm buildings, with nearby footpaths and flood-risk access land.
“The application relates to an agricultural barn that is removed from the main building group. The barn is located approximately 20 metres from the vehicular access track leading to the farm building group. The barn is located approximately 350 metres to the north east of the farm building group and approximately 120 metres to the south west of the public highway running from the B5056 to Parwich village.”
“The barn itself and surrounding curtilage is located within flood zone 1 (land with lowest probability of flooding). However, part of the access track between the barn and the public highway fall within flood zone 2 and flood zone 3 (land with highest probability of flooding)”
Officer report
The building’s history
The original barn substantially collapsed, was extensively rebuilt without planning permission, and was considered a new building with limited heritage significance.
“A stone barn at the site dating from the early 19 th century was substantially intact until approximately 2005. By 2009 the roof and most of the east wall had collapsed. Due to the extent of the rebuilding which has taken place, and its variance from the barn which stood prior to circa 2005, the current barn is considered to be a new building and as such has limited heritage significance.”
“Due to the extent of the rebuilding which has taken place, combined with the loss of the original roof, and the variance from the original in terms of apertures and stonework size and coursing it is considered that the stone barn currently standing is tantamount to a new build barn. As such the present structure is not considered to be of vernacular merit and is not considered to be a non-designated heritage asset with heritage significance.”
Officer report
What officers recommended
Officers recommended refusal because the building lacked sufficient heritage significance and the proposal raised design, landscape and flood-risk concerns.
“The proposed conversion to a market dwelling is not considered to be acceptable in principle and is contrary to Core Strategy policy HC1 and Development Management policy DMC10. The building has recently been substantially re-built and is significantly different to the barn which stood prior to 2005. The existing building therefore is not considered to be a heritage asset.”
“A Flood Risk Assessment (FRA) has not been submitted with the application. As such it has not been possible to determine the risk of flooding to the development and the impact this may have on flood risk elsewhere. An FRA is also required to set out measures to reduce and manage the risk of flooding. Therefore, the submitted proposal is contrary to Core Strategy policy CC5, Development Management policy DMC3 and paragraph 181 of the NPPF.”
Officer report
Consultation responses
Highways raised no objection, the parish council supported the application, and ecology supported it subject to bird and enhancement conditions.
“Parwich Parish Council – The Council supports this application noting in particular, 1. The quality of the application documents. The sympathetic treatment of the building's historic fabric. The benefit of finding an economic use for historic buildings that might otherwise fall into decay.”
“PDNPA Ecology – No objection subject to conditions relating to pre works checks for bird nests during the bird breeding season and for a scheme of ecological enhancement.”
Officer report
Who spoke
The agent spoke under the public participation scheme.
The committee vote
A motion to refuse the application was proposed, seconded, put to the vote and carried.
“A motion to refuse the application was proposed, seconded, put to the vote and carried.”
Minutes
The members' reasons
The resolution gives these reasons:
Minutes
- The proposed character and appearance of the building as converted would not conserve or enhance the agricultural character of the building and as such would be contrary to Development Management policies DMC3 and DMC10 and the Authority’s SPDs relating to Design and the C
Source: the council's minutes, quoted word for word.
Sources
- Peak District Planning Committee minutes, 5 September 2025
- Agenda and papers (council website)
Source: Plota analysis of Peak District's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Peak District Planning Committee
- Council
- Peak District
- Date
- Friday 5 September 2025
- Recommendation
- Officers recommended refusal
- Committee decided
- Refused
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Peak District committee decisions →
This committee's year
15 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.