Solar and renewables in Westmorland and Furness

Westmorland and Furness received 30 renewable energy applications in the last 12 months, including 2 battery storage sites and 9 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

15
|
2
|
0

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 15 of 15 applications
2026/1499/SCOPE 24 Jul 2026 Pending

Leith Energy Storage Land Northeast of Plumpton

Scoping opinion request for battery energy storage scheme with associated infrastructure.

Westmorland And Furness 24 Jul 2026
2026/1181/FPA 24 Jul 2026 Pending

Kendal Leisure Centre Burton Road KENDAL LA9 7HX

Installation of six air-source heat pumps, together with the erection of a building to house associated M&E plant and a new electricity sub-station. N...

Westmorland And Furness 24 Jul 2026
B18/2026/0312 22 Jul 2026 PENDING

South Side of Salthouse Road, Barrow in Furness, Cumbria, LA14 2BQ

Development and operation of a micro energy storage project.

Westmorland And Furness 22 Jul 2026
B21/2026/0304 8 Jul 2026 PENDING

Marton Hall, 45 Moor Road, Marton, Ulverston, Cumbria, LA12 0NJ.

Installation of 120m2 solar panel ground mounted array with section of replacement stone wall.

Westmorland And Furness 8 Jul 2026
2026/1063/HOU 3 Jul 2026 Pending

7 Ruskin Drive Kirkby Lonsdale CARNFORTH LA6 2DB

Ground floor extension to front elevation, alterations to rear elevation, creation of dormer extension to rear roof slope and replacement of roof to i...

Westmorland And Furness 3 Jul 2026
2026/1328/LDPR 30 Jun 2026 Pending

7 Bective Road Kirkby Lonsdale CARNFORTH LA6 2BG

Application for a Lawful Development Certificate for the proposed installation of an air source heat pump

Westmorland And Furness 30 Jun 2026
2026/1142/DISC 15 Jun 2026 Pending

Car Park Ford Park ULVERSTON LA12 7JP

Application for the approval of details reserved by conditions 5 (External surfaces), 6 (Soft landscaping), 8 (Surface water drainage), 9 (Sustainable...

Westmorland And Furness 15 Jun 2026
BPA8/2026/0206 10 Jun 2026 PENDING

Craven House, Michaelson Road, Barrow-In-Furness, Cumbria, LA14 1FD

Application to determine if prior approval is required for a proposed:-Re-roofing with Bauder bitumen roof felt, renewal of key clamp fall arrest syst...

Westmorland And Furness 10 Jun 2026
2026/1183/PASOLAR 8 Jun 2026 Pending

Kendal Leisure Centre Burton Road KENDAL LA9 7HX

Prior Notification under Schedule 2, Part 14, Class J for the installation of 196 photovoltaic panels on the north part of the main leisure centre roo...

Westmorland And Furness 8 Jun 2026
2026/1151/FPA 8 Jun 2026 Pending

37 Main Street Kirkby Lonsdale CARNFORTH LA6 2AH

Installation of solar panels.

Westmorland And Furness 8 Jun 2026
2026/1121/FPA 8 Jun 2026 Pending

41A Main Street Kirkby Lonsdale CARNFORTH LA6 2AH

Installation of solar panels

Westmorland And Furness 8 Jun 2026
2026/1075/FPA 8 Jun 2026 Pending

48-50 Main Street Kirkby Lonsdale CARNFORTH LA6 2AJ

Installation of solar panels

Westmorland And Furness 8 Jun 2026
2026/0996/HOU 1 Jun 2026 Pending

Mid Town Farm Long Marton Appleby-in-westmorland CA16 6BN

Replacement roof and installation of solar panels.

Westmorland And Furness 1 Jun 2026
2025/1930/HOU 1 Jun 2026 Pending

The Old Rectory Clifton Penrith CA10 2EA

External painting of dwelling, removal of redundant oil tank and installation of an air-source heat pump and replacement of existing septic tank with ...

Westmorland And Furness 1 Jun 2026
2026/0698/HOU 27 May 2026 Pending

The Meeting House Quakers Lane Sockbridge Penrith CA10 2JR

Installation of air source heat pump.

Westmorland And Furness 27 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Westmorland and Furness

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Westmorland and Furness?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Westmorland and Furness. You can also narrow the alert to a postcode, street, or drawn area.

We check Westmorland and Furness's planning portal daily. New solar & renewables applications appear here within a day of being published.