Solar and renewables in Lake District

Lake District received 44 renewable energy applications in the last 12 months, including 1 battery storage site and 12 heat pumps. Of the 31 decided so far, 27 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Lake District

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 18 of 18 applications
19 Nov 2026 Application being considered 7/2026/5569

Beech Hill Hotel, Newby Bridge Road, Windermere, Cumbria, LA23 3LR

Proposed Lake Source Heat Pump Collectors to be suspended via cables under one of the Jetties (planning reference 7/2026/5276 which was approved 23rd ...

Full Planning application Lake District
18 Nov 2026 Application being considered 7/2026/2197

Bannest Hill, Hesket Newmarket, CA7 8JT

Installation of solar panels over metal roof above kitchen, with small boot room extension to west side of utility room.

Full Planning application Lake District
11 Nov 2026 Valid. 7/2026/2183

Cumbria Fire & Rescue Service, Fire Station, Penrith Road, Keswick, CA12 4PA

Solar array to fix to the roof using a rail, anchor points to be screwed into existing roof

CLPUD - Certificate of Lawfulness of Proposed Use or Development Lake District
29 Oct 2026 Application being considered 7/2026/4060

The Stables, Bootle, Nr Millom, Cumbria, LA19 5TJ

Installation of solar panels on the front roof of the house nearest the main road (approximately west). Installation of waste treatment plant replaci...

CLEUD - Certificate of Lawfulness of Existing Use or Development Lake District
29 Oct 2026 Application being considered 7/2026/4062

Stagends House, Wasdale, CA20 1ET

Minor modifications including Install of an air source heat-pump, Fireplace Modifications, Replacement Window, Kitchen Extract Fan

Listed Building Consent application Lake District
28 Oct 2026 Application being considered 7/2026/2192

Orchard Cottage, Millbeck Village, Millbeck, Cumberland, CA12 4PS

Installation of an air source heat pump, replacement of two existing metal casement windows with double-glazed timber windows, and replacement of the ...

Listed Building Consent application Lake District
19 Oct 2026 Valid. 7/2026/5570

4, Gale Park, Ambleside, LA22 0BN

Extensions and alterations to dwellinghouse including installation of solar panels. Erection of garden shed/store, greenhouse and bin area.

Full Planning application Lake District
13 Oct 2026 Application being considered 7/2026/3111

Green Close, Penruddock, Penrith, CA11 0RY

Installation of a single 6kw wind turbine with a 9m pole on a 2.6m2 square concrete plinth.

Full Planning application Lake District
7 Oct 2026 Application being considered 7/2026/5508

Parkside, College Road, Windermere, LA23 1BU

Installation of a roof-mounted solar photovoltaic array, with associated on-roof mounting rails and fixings, perimeter bird-proofing mesh, hybrid inve...

Full Planning application Lake District
6 Oct 2026 Application being considered 7/2026/3105

Helton Head, Helton, Penrith, CA10 2QA

Free standing domestic solar array

Full Planning application Lake District
5 Oct 2026 Approved 28 Oct 7/2026/5541

The Bungalow, Cartmel Road, Lindale, Grange-over-sands, LA11 6LZ

Installation of solar PV array on roof of property

CLPUD - Certificate of Lawfulness of Proposed Use or Development Lake District
29 Sept 2026 Application being considered 7/2026/3100

Royal Hotel, Dockray, Penrith, CA11 0JY

1. Removal of two existing staff accommodation static caravans and replacement with two new staff accommodation cabins, to the rear of The Royal Hotel...

Full Planning application Lake District
28 Sept 2026 Approved 10 Nov 7/2026/5485

2 Wilson House Farm, Kendal Road, Lindale, Westmorland And Furness, LA11 6QR

Addition of up to 19 solar panels on the south facing roof, addition of a storag

Full Planning application Lake District
25 Sept 2026 Approved 6 Nov 7/2026/5470

High Birks Farm, Crosthwaite, Kendal, LA8 8BX

Installation of in-roof solar PV array and air-source heat pump; replacement win

S73 (Amend/Delete Condition) Lake District
18 Sept 2026 Refused 4 Nov 7/2026/5500

Ormandy House, Crosthwaite, Kendal, LA8 8BP

Installation of solar panels to roof of separate barn/garage together with associated works

Listed Building Consent application Lake District
18 Sept 2026 Approved 1 Oct 7/2026/2162

Bassenthwaite Lakeside Lodges, Bassenthwaite, Keswick, CA12 4QZ

Installation of roof mounted photovoltaic solar panels and wall mounted batterie

CLPUD - Certificate of Lawfulness of Proposed Use or Development Lake District
2 Sept 2026 Approved 3 Nov 7/2026/5504

Old Dairy Barn, Key Moss, Witherslack, Grange over Sands, LA11 6RX

Change of use from Barn to storage barn and residential - variation of condition

S73 (Amend/Delete Condition) Lake District
24 Aug 2026 Approved 9 Oct 7/2026/2153

2 Woodend Cottages, Thornthwaite, Keswick, Cumbria, CA12 5SJ

Proposed 2 storey side extension including first floor balcony and ASHP condense

Full Planning application Lake District
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Lake District

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Lake District?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Lake District. You can also narrow the alert to a postcode, street, or drawn area.

We check Lake District's planning portal daily. New solar & renewables applications appear here within a day of being published.