Solar and renewables in Uttlesford

Uttlesford received 26 renewable energy applications in the last 12 months, including 3 battery storage sites and 4 heat pumps. Of the 19 decided so far, 14 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

12
|
3
|
3
Get alerts for Uttlesford

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
UTT/26/2111/FUL 17 Aug 2026 Pending

Widdington House Wood End Widdington Saffron Walden Essex CB11 3SN

Ground mounted solar PV panels

Fully Detailed Uttlesford 17 Aug 2026
UTT/26/1861/CLP 11 Aug 2026 Pending

62 Burgattes Road Little Canfield Essex CM6 1FW

Installation of a single wall-mounted air source heat pump (reversible air-to-air unit providing heating and cooling) to the flank wall of the dwellin...

Proposed Cert of Lawfulness Uttlesford 11 Aug 2026
UTT/26/1982/HHF 10 Aug 2026 Pending

Ruttels Valance Road Clavering Essex CB11 4RS

Erection of annexe/study outbuilding to provide ancillary accommodation, extension to approved garage for plantroom, ASHP located behind garage and 1 ...

Householder Full Application Uttlesford 10 Aug 2026
UTT/26/1730/HHF 20 Jul 2026 Approved

The Old Coach House Pledgdon Green Brick End Road Henham Bishops Stortford CM22 6BN

Install 10 solar panels to the west facing sloped roof

Householder Full Application Uttlesford 20 Jul 2026
UTT/26/1552/HHF 2 Jul 2026 Refused

T Meadow High Street Elmdon Essex CB11 4NL

Install 12 no. DMEGC 470W all black solar panels. 8 no. on a modern extension to the listed building, and 4 no. on a garden shed. Install a 10kWh SigE...

Householder Full Application Uttlesford 2 Jul 2026
UTT/26/1553/LB 2 Jul 2026 Refused

T Meadow High Street Elmdon Essex CB11 4NL

Install 12 no. DMEGC 470W all black solar panels. 8 no. on a modern extension to the listed building, and 4 no. on a garden shed. Install a 10kWh SigE...

Listed Building Uttlesford 2 Jul 2026
UTT/26/1601/HHF 29 Jun 2026 Awaiting decision

Ashdon Hall Church Hill Ashdon Essex CB10 2HF

Replacement of modern extensions, minor internal alterations to provide better bathroom provision, construction of a glasshouse and gardeners' room wi...

Householder Full Application Uttlesford 29 Jun 2026
UTT/26/1602/LB 29 Jun 2026 Awaiting decision

Ashdon Hall Church Hill Ashdon Essex CB10 2HF

Replacement of modern extensions, minor internal alterations to provide better bathroom provision, construction of a glasshouse and gardeners' room wi...

Listed Building Uttlesford 29 Jun 2026
UTT/26/1408/LB 19 Jun 2026 Approved

21 Bush End Takeley Essex CM22 6NN

Installation of a heat pump and associated pipework and cable

Listed Building Uttlesford 19 Jun 2026
UTT/26/1437/HHF 19 Jun 2026 Approved

21 Bush End Takeley Bishops Stortford CM22 6NN

Installation of a heat pump and associated pipework and cable

Householder Full Application Uttlesford 19 Jun 2026
UTT/26/1302/FUL 11 Jun 2026 Awaiting decision

Land At Tewes Farm Thaxted Road Little Sampford Essex

Proposed ground mounted solar PV array together with associated infrastructure, security fencing, CCTV, private and DNO substations, perimeter fencing...

Fully Detailed Uttlesford 11 Jun 2026
UTT/26/1318/HHF 1 Jun 2026 Approved

Town Farmhouse Cage End Hatfield Broad Oak Bishops Stortford CM22 7HT

Installation of solar panels and associated battery storage on detached annex building, within the curtilage of the main building.

Householder Full Application Uttlesford 1 Jun 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Uttlesford

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Uttlesford?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Uttlesford. You can also narrow the alert to a postcode, street, or drawn area.

We check Uttlesford's planning portal daily. New solar & renewables applications appear here within a day of being published.