Solar and renewables in Braintree

Braintree received 62 renewable energy applications in the last 12 months, including 8 solar farms, 3 battery storage sites and 3 heat pumps. Of the 37 decided so far, 31 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Braintree

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 20 of 20 applications
22 Oct 2026 Pending Consideration 26/02486/DOR

Longfield Solar Farm Large Site Covering Land To The West Of The District And Within Chelmsford City Council

Longfield Solar Farm - Commencement of Phase 2

Braintree
21 Oct 2026 Pending Consideration 26/02485/DOR

Longfield Solar Farm Large Site Covering Land To The West Of The District And Within Chelmsford City Council

Longfield Solar Farm - Commencement of Phase 1 and the Authorised Development

Braintree
21 Oct 2026 Pending Consideration 26/02422/HH

The Thatched Cottage Church Street Gestingthorpe Essex CO9 3AZ

Installation of Heat Pump.

Braintree
9 Oct 2026 Pending Consideration 26/02235/FUL

Empire Theatre Butler Road Halstead Essex CO9 1LL

Demolition of existing car wash, storage areas and theatre extension; erection of an extension to the existing theatre to provide a Community Arts Cen...

Braintree
1 Oct 2026 Pending Consideration 26/02256/GOV

Redmere Wind Farm

Planning Act 2008 (as amended) and The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (The EIA Regulations) - Regulations ...

Braintree
30 Sept 2026 Pending Consideration 26/02097/HH

Asher House Vicarage Road Finchingfield Essex CM7 4LF

Installation of a ground-mounted solar photovoltaic array comprising 44 No. PV panels to provide renewable energy for the existing dwellinghouse.

Braintree
28 Sept 2026 Pending Consideration 26/02110/HH

10 - 11 Northfield Great Bardfield Essex CM7 4TF

Proposed Installation of Photovoltaic (PV) Panels to Nos. 10 - 11 Northfield.

Braintree
28 Sept 2026 Pending Consideration 26/02109/HH

7 - 9 Northfield Great Bardfield Essex CM7 4TF

Proposed installation of Solar (PV) Panels to Nos. 7-9 Northfield.

Braintree
25 Sept 2026 Pending Consideration 26/02106/HH

1 - 3 Northfield Great Bardfield Essex CM7 4TF

Proposed Installation of Photovoltaic (PV) Panels to Nos. 1 - 3 Northfield.

Braintree
7 Sept 2026 Pending Consideration 26/02005/FUL

Stone Lakes Sloe Hill Halstead Essex CO9 1PA

Erection of a single, small-scale vertical axis wind turbine.

Braintree
2 Sept 2026 Refused 14 Oct 26/11870/CLPLB

The Chase 49 Head Street Halstead Essex CO9 2AU

Installation of 20 Solar Panels onto the roof of the garage.

Braintree
24 Aug 2026 Pending Consideration 26/01942/FUL

Land West Of A131 And North Of Butlers Wood Sudbury Road Bulmer Essex

The installation and operation and a Battery Energy Storage System (BESS) with associated infrastructure, access (primary and secondary) and ancillary...

Braintree
17 Aug 2026 Approved 9 Oct 26/01881/HH

Ten Acres North End Road Little Yeldham Essex CO9 4LG

Proposed detached workshop outbuilding with 12No. solar panels on the roof.

Braintree
13 Aug 2026 Approved 7 Oct 26/01834/FUL

Aldi Foodstore Ltd Reid Road Witham Essex CM8 1XU

Replacement of refrigeration plant equipment, installation of air source heat pumps, and replacement enclosures and fencing.

Braintree
13 Aug 2026 Approved 6 Oct 26/01836/LBC

Bishops Hall The Street Ashen Essex CO10 8JN

Decommissioning of oil heating system and installation of an external ASHP (Samsung EHS Gen 7 16kW) on North elevation; ground-floor RetroRoute UFH in...

Braintree
13 Aug 2026 Approved 6 Oct 26/01835/HH

Bishops Hall The Street Ashen Essex CO10 8JN

Decommissioning of oil heating system and installation of an external ASHP on North elevation; ground-floor under floor heating in 20th century screed...

Braintree
11 Aug 2026 Approved 6 Oct 26/01839/HH

Rushley Green Barn Rushley Green Castle Hedingham Essex CO9 3AH

Erection & installation of a ground-mounted solar photovoltaic (PV) array

Braintree
3 Aug 2026 Decided 20 Aug 26/01793/SCR

Land To The West Of Lanhams Lanham Farm Road Cressing Essex

Town & Country Planning Act 1990 (as amended), Town & Country Planning (Environmental Impact Assessment) Regulations 2017 - Extension to the consented...

Braintree
29 Jul 2026 Decided 10 Sep 26/01761/SCO

Robin Hood Solar Farm Finchingfield Road Stambourne Essex

Town & Country Planning Act 1990 (as amended), Town & Country Planning (Environmental Impact Assessment) Regulations 2017 - Scoping Opinion Request -P...

Braintree
29 Jul 2026 Approved 13 Oct 26/01018/FUL

Silver End Village Hall Broadway Silver End Essex CM8 3RQ

Removal of the tank room and the installation of solar panels with associated cabling.

Braintree
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Braintree

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Braintree?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Braintree. You can also narrow the alert to a postcode, street, or drawn area.

We check Braintree's planning portal daily. New solar & renewables applications appear here within a day of being published.