Solar and renewables in Chelmsford

Chelmsford received 41 renewable energy applications in the last 12 months, including 3 solar farms, 2 battery storage sites and 11 heat pumps. Of the 18 decided so far, 17 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Chelmsford

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 21 of 21 applications
11 Nov 2026 Pending Consideration 26/01500/FUL

Walnut Tree Cottage Woodhill Road Sandon Chelmsford Essex CM2 7SF

Proposed solar panels

10 Nov 2026 Pending Consideration 26/01484/FUL

64 Harris Crescent Chelmsford CM1 6HT

Proposed installation of an air conditioning system / heat pump

10 Nov 2026 Pending Consideration 26/01499/FUL

Little Gables Woodhill Road Sandon Chelmsford Essex CM2 7SF

Proposed Solar Panels

9 Nov 2026 Pending Consideration 26/01539/LBC

Timothy Cottage Tituswell Lane Good Easter Chelmsford Essex CM1 4QA

Installation of a 17 panel solar PV system split over the roof pitches of the detached garage

9 Nov 2026 Pending Consideration 26/01538/FUL

Timothy Cottage Tituswell Lane Good Easter Chelmsford Essex CM1 4QA

Installation of a 17 panel solar PV system split over the roof pitches of the detached garage

3 Nov 2026 Pending Consideration 26/01489/FUL

Meadow View Bulls Lodge Farm Generals Lane Boreham Chelmsford Essex CM3 3HN

Proposed Installation of an Air Source Heat Pump to be installed to the property.

3 Nov 2026 Pending Consideration 26/01433/FUL

106 The Street Little Waltham Chelmsford Essex CM3 3NT

Demolition of existing conservatory, construction of single storey rear extension and alterations to existing rear projection. Air source heat pump an...

3 Nov 2026 Pending Consideration 26/01434/LBC

106 The Street Little Waltham Chelmsford Essex CM3 3NT

Demolition of existing conservatory, construction of single storey rear extension and alterations to existing rear projection. Air source heat pump an...

28 Oct 2026 Pending Consideration 26/01467/EIASO

Flemings Farm Warren Road Downham Billericay CM3 8HU

Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in respect of a proposed solar farm known as ...

Chelmsford
27 Oct 2026 Pending Decision 26/01459/OBS3

The Planning Inspectorate Chelmsford Bypass Chelmsford Essex

Proposed application by Dengie Peninsula Energy Park Limited (the applicant) for an Order granting Development Consent for the Dengie Peninsula Energy...

19 Oct 2026 Pending Consideration 26/01317/FUL

50 Wilfred Waterman Drive Chelmsford Garden Community Chelmsford CM1 6AZ

Installation of 26 solar panels

6 Oct 2026 Pending Consideration 26/01300/FUL

Old Riffhams Riffhams Chase Little Baddow Chelmsford Essex CM3 4AU

Replacement of swimming pool ancillary buildings and installation of Air Source Heat Pump. Repairs to existing wall.

5 Oct 2026 Pending Consideration 26/01353/FUL

The Sparrows Back Lane Pleshey Chelmsford CM3 1HJ

Proposed installation of air source heat pump to rear of property

28 Sept 2026 Approved 13 Nov 26/01318/FUL

17 Middlemead West Hanningfield Chelmsford Essex CM2 8UT

Installation of air source heat pump to rear of property

22 Sept 2026 Pending Consideration 26/01233/FUL

Great Oaks The Common East Hanningfield Chelmsford Essex CM3 8AL

Erection of a detached single-storey, single-occupancy care unit with associated patio, access paths, landscaping, drainage and photovoltaic panels, f...

16 Sept 2026 Pending Decision 26/00553/FUL

Land North Of Round Roblets Bedfords Farm Road Good Easter Chelmsford Essex

Proposed change of land use from agricultural to equestrian. 22 unit solar panel array and school equestrian arena.

15 Sept 2026 Pending Decision 26/01174/FUL

Cobblers Mill Road Good Easter Chelmsford Essex CM1 4SH

Installation of 9 no. black roof-mounted solar photovoltaic (PV) panels on the west-facing roof slope of the detached barn/car-port.

15 Sept 2026 Pending Consideration 26/01175/LBC

Cobblers Mill Road Good Easter Chelmsford Essex CM1 4SH

Installation of 9 no. black roof-mounted solar photovoltaic (PV) panels on the west-facing roof slope of the detached barn/car-port.

14 Sept 2026 Pending Consideration 26/01192/FUL

Shakestone Farmhouse Writtle Road Chelmsford CM1 3RL

Redevelopment of the existing mixed use farmstead complex to provide commercial units, associated access roads, service yards, car parking, landscapin...

3 Sept 2026 Refused 28 Oct 26/01215/LBC

St Josephs Nursing Home Gay Bowers Road Danbury Chelmsford Essex CM3 4JQ

Proposed Solar panel installation to roofs of existing Nursing Home

25 Aug 2026 Approved 18 Nov 26/01167/FUL

7 Pyne Gate Galleywood Chelmsford Essex CM2 8QG

Proposed new roof design & additional windows to previously approved single storey rear extension, new rear patio and part increase in height of side ...

Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Chelmsford

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Chelmsford?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Chelmsford. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Chelmsford's planning portal daily. New solar & renewables applications appear here within a day of being published.