Redmere Wind Farm Data via plota.co.uk

Pending 26/02256/GOV
Date received
1 Oct 2026
Date validated
1 Oct 2026

Description

Planning Act 2008 (as amended) and The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (The EIA Regulations) - Regulations 10 and 11 Proposed application by Vattenfall Wind Power Limited (the applicant) for an Order granting Development Consent for the Redmere Wind Farm (the proposed development) Scoping consultation and notification of the applicants contact details and duty to make available information to the applicant if requested Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 26 Nov 2026, from recent full applications across the UK.

Day 8 of the 56-day target. Councils usually decide full applications by day 56.

Day 848 days to the 56-day target
56%decided within 8 weeks
87%approved
93,033decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Braintree to go on. Braintree decision record →

Site constraints 3

17 listed buildings within 150 m of the postcode pin
Nearest: 6 8, Rayne Road, Grade II, about 26 m from the postcode pin · 2 Grade II*, 15 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 17 with distances
Historic England ↗
Braintree Town Centre and Bradford Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Braintree built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Braintree
Planning Authority Score
7/10
Good
#61 of 296 councils
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications, ranking #47 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026