Solar and renewables in South Hams

South Hams received 63 renewable energy applications in the last 12 months, including 2 solar farms, 3 battery storage sites and 10 heat pumps. Of the 45 decided so far, 43 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for South Hams

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 16 of 16 applications
19 Nov 2026 Under Consideration 3168/26/CLP

Kullavik Higher Contour Road Kingswear TQ6 0DE

Certificate of lawfulness for proposed PV's to SE and NW elevations

Certificate of Lawfulness for Proposed Use South Hams
4 Nov 2026 Within Consultation Period 2962/26/HHO

10 Marldon Grove Marldon TQ3 1PN

Replacement of polycarbonate roof with new section of flat roof, erection of outbuilding, external landscaping, solar panels & ASHP

Householder Application South Hams
3 Nov 2026 Within Consultation Period 2900/26/HHO

12 Crosslands Thurlestone TQ7 3TF

Rear garage extension, front roof extension, roof alterations, replacement windows, installation of PV, ASHP and EVC and external renovations

Householder Application South Hams
2 Nov 2026 Approved 12 Nov 3041/26/CLP

5 Britannia Court Higher Contour Road Kingswear TQ6 0DS

Certificate of lawfulness for the proposed installation of solar panels on the south east facing pitched roof.

Certificate of Lawfulness for Proposed Use South Hams
28 Oct 2026 Within Consultation Period 2976/26/HHO

Ash Park East Prawle TQ7 2BX

Refurbishment and enlargement of existing solar panel array on outbuilding roof

Householder Application South Hams
23 Oct 2026 Within Consultation Period 2640/26/HHO

Studdys Farm Capton Dartmouth TQ6 0JE

Installation of small ground mounted solar array

Householder Application South Hams
19 Oct 2026 Within Consultation Period 2864/26/LBC

32A Vicarage Hill Holbeton PL8 1LH

Replace the oil boiler with an air source heat pump

Listed Building Consent South Hams
19 Oct 2026 Within Consultation Period 2863/26/HHO

32A Vicarage Hill Holbeton PL8 1LH

Replace the oil boiler with an air source heat pump.

Householder Application South Hams
7 Oct 2026 Withdrawn 21 Oct 2176/26/HHO

Oldaport Modbury PL21 0TG

Demolition of a single storey lean-to extension, demolition of a single storey pitched roof link extension and replacement with a more sympathetic lin...

Householder Application South Hams
5 Oct 2026 Under Consideration 2438/26/HHO

45 Leat Walk Roborough PL6 7AT

Proposed detached garage with solar panel on south east elevation

Householder Application South Hams
2 Oct 2026 Under Consideration 2711/26/LBC

Preston House and Preston House Barn Woodleigh TQ7 4DW

Removal of 2 no. oil-fired boilers and 2 no. external oil storage tanks, and replacement with 2 no. air source heat pumps. Retrospective installation ...

Listed Building Consent South Hams
2 Oct 2026 Under Consideration 2710/26/FUL

Preston House & Preston House Barn, Woodleigh, TQ7 4DW

Removal of 2 no. oil-fired boilers and 2 no. external oil storage tanks, and replacement with 2 no. air source heat pumps. Retrospective installation ...

Full Planning Application South Hams
3 Sept 2026 Approved 29 Oct 2473/26/HHO

Waterside East Portlemouth TQ8 8PU

Raising of roof height, installation of new openings, rooflights & solar PV

Householder Application South Hams
3 Sept 2026 Under Consideration 2370/26/FUL

Cutwellcombe Farm Avonwick TQ10 9HA

The provision of 3no. storage containers for the installation of 205KW containerised biomass boilers and associated facilities

Full Planning Application South Hams
3 Sept 2026 Approved 6 Nov 2459/26/FUL

Withymore Farm Malborough TQ7 3ED

Installation of 24 ground mounted solar panels with associated cable run

Full Planning Application South Hams
26 Aug 2026 Under Consideration 2177/26/LBC

Oldaport Modbury PL21 0TG

Programme of refurbishment and alterations including the demolition of a single storey lean-to extension, demolition of a single storey pitched roof l...

Listed Building Consent South Hams
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in South Hams

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in South Hams?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by South Hams. You can also narrow the alert to a postcode, street, or drawn area.

We check South Hams's planning portal daily. New solar & renewables applications appear here within a day of being published.