Solar and renewables in Teignbridge

Teignbridge received 26 renewable energy applications in the last 12 months, including 4 heat pumps. Of the 24 decided so far, 18 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Teignbridge

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 7 of 7 applications
16 Oct 2026 Pending Consideration 26/01596/CLDP

Farleigh House Shute Hill Bishopsteignton Devon TQ14 9QL

Certificate of Lawfulness for proposed installation of 15 roof-mounted photovoltaic solar panels to the south-facing pitched roof of the dwelling

Certificate of Lawful Use Proposed Teignbridge
15 Oct 2026 Pending Consideration 26/01546/FUL

The Croft Lower Ashton Devon EX6 7QN

Proposed installation of solar panels

Full Planning Application Teignbridge
9 Sept 2026 Approved 8 Oct 26/01410/HOU

54 Highweek Village Newton Abbot Devon TQ12 1QQ

Proposed demolition of existing garage and new replacement outbuilding with roof mounted solar panels

Householder applications Teignbridge
28 Aug 2026 Refused 14 Oct 26/01345/CLDP

Strand Community Trust Ltd 32 The Strand Dawlish Devon EX7 9PT

Certificate of Lawfulness for proposed installation of an 8.64 kWp roof-mounted solar photovoltaic system on the south-facing roof slope

Certificate of Lawful Use Proposed Teignbridge
21 Aug 2026 Refused 16 Oct 26/01291/FUL

Riverside Community Centre Station Road Bovey Tracey Devon TQ13 9AW

Air source heat pump installation

Full Planning Application Teignbridge
17 Aug 2026 Approved 12 Oct 26/01258/HOU

21 Templers Way Kingsteignton Devon TQ12 3NX

Extensions to side and rear, roof alterations at front, fenestration changes, solar panel installation, internal alterations, new boundary wall and cr...

Householder applications Teignbridge
10 Aug 2026 Approved 22 Sep 26/01156/HOU

The Old Vicarage Longdown Devon EX6 7SW

Installation of 14 ground-mounted solar panels

Householder applications Teignbridge
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Teignbridge

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Teignbridge?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Teignbridge. You can also narrow the alert to a postcode, street, or drawn area.

We check Teignbridge's planning portal daily. New solar & renewables applications appear here within a day of being published.