Solar and renewables in Exeter

Exeter received 30 renewable energy applications in the last 12 months, including 2 battery storage sites and 3 heat pumps. Of the 23 decided so far, 21 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Exeter

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 8 of 8 applications
5 Nov 2026 Pending Consideration 26/1674/FUL

Coromandel Mount Howe Topsham EX3 0BG

Demolition of side conservatory, and replacement with single storey side extension. Cladding of building, replacement roof covering to include solar p...

Full Planning Permission Exeter
29 Oct 2026 Pending Consideration 26/1523/FUL

Royal Devon And Exeter Hospital Barrack Road Exeter

Installation of a Battery Energy Storage System

Full Planning Permission
19 Oct 2026 Pending Consideration 26/1494/FUL

Holland Hall Clydesdale Road Exeter EX4 4SA

An external Air Source Heat Pump (ASHP) enclosure consisting of 12.5m x 9.5m concrete slab, retaining wall, ASHP installation, acoustic enclosures and...

Full Planning Permission
19 Oct 2026 Pending Consideration 26/1493/FUL

University Library Stocker Road Exeter EX4 4PT

External Air Source Heat Pump (ASHP) enclosure consisting of 12.5m x 9.5m concrete slab, retaining wall, ASHP installation, acoustic enclosures and pe...

Full Planning Permission
16 Oct 2026 Pending Consideration 26/1317/FUL

Sidwell Studios Acland Road Exeter

Installation of six air con units on the northwest return elevation and associated pipework and the installation of solar panels to the flat roof.

Full Planning Permission
30 Sept 2026 Pending Consideration 26/1454/LBC

16 Southernhay West Exeter EX1 1PJ

Works associated with change of use from offices to a dwelling including removal of rear outrigger, removal of partition walls, replacement basement s...

Listed Building Consent
16 Sept 2026 Approved 23 Oct 26/1394/PDPV

1 The Lyndons Lyndhurst Road Exeter EX2 4PT

Installation of a roof-mounted 15-panel solar photovoltaic (PV) array.

Prior Approval - Solar Panels (Part 14)
8 Sept 2026 Approved 2 Nov 26/1351/FUL

Barley Brake Nadderwater Exeter EX4 2JF

Demolition of existing extension; building of new single storey side extension and pergola; installation of air source heat pump and solar panels.

Full Planning Permission
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Exeter

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Exeter?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Exeter. You can also narrow the alert to a postcode, street, or drawn area.

We check Exeter's planning portal daily. New solar & renewables applications appear here within a day of being published.