Shetlands received 26 renewable energy applications in the last 12 months, including 1 battery storage site and 8 heat pumps. All 17 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Shetlands

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 7 of 7 applications
Yesterday Pending 2026/219/PPF

The Manse Firth Mossbank Shetland ZE2 9RB

To convert an existing single storey outbuilding to form a single-storey self-contained residential unit; erect new porch extension; install an air so...

Planning Permission Full Shetlands
15 Oct 2026 Pending Consideration 2026/215/PPF

Collaquoy Ollaberry Shetland

Erection of single storey dwellinghouse with ASHP and integral garage, formation vehicular access and associated landscaping and drainage works. inclu...

Planning Permission Full Shetlands
2 Oct 2026 Pending Consideration 2026/203/PPF

Mossy Hill Wind Farm Site Ladies Drive LERWICK

Construction of new access junction on Ladies Drive to serve Mossy Hill Wind Farm and substation.

Planning Permission Full Shetlands
4 Sept 2026 Awaiting decision 2026/186/PPF

Rose Cottage, Baltasound, Unst. Shetland.

To demolish existing dwellinghouse and erect new single storey dwellinghouse with ASHP and timber decking and detached domestic workshop and storage b...

Planning Permission Full Shetlands
27 Aug 2026 Approved 7 Oct 2026/176/PPF

Plot (East Of Hillgrind) Firth Mossbank Shetland

Erection of single storey dwellinghouse with integral double garage, with ASHP and timber decking, formation of vechicular access, and erection of 1.2...

Planning Permission Full Shetlands
5 Aug 2026 Unknown 2026/162/ECUCON

Neshion Energy Park Land To East Of Sullom Voe Oil Terminal Mossbank Shetland

Consultation in relation to a Section 36 application under the Electricity Act 1989 for 8 wind turbines with a maximum tip height of 200m, battery ene...

Energy Consents Unit Shetlands
30 Jul 2026 Approved 21 Oct 2026/009/WL

Bluemull Sound, Cullivoe

To continue deployment of an existing tidal array & associated works.

Works Licence Shetlands
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Shetlands

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Shetlands?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Shetlands. You can also narrow the alert to a postcode, street, or drawn area.

We check Shetlands's planning portal daily. New solar & renewables applications appear here within a day of being published.