Solar and renewables in Scottish Borders

Scottish Borders received 61 renewable energy applications in the last 12 months, including 8 battery storage sites and 5 heat pumps. Of the 39 decided so far, 37 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Scottish Borders

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 23 of 23 applications
18 Nov 2026 Registered 26/01741/SCO

Repowered Dun Law Phase 1 Wind Farm Oxton Scottish Borders

Wind Farm comprising up to 10 turbines with a maximum blade tip height of 220m with a combined capacity exceeding 50MW, including battery energy stora...

Scoping Opinion
18 Nov 2026 Registered 26/01740/PAN

Land North Of Windshiel Farm Windshiel Duns Scottish Borders

Wind farm developmentand associated infrastructure including electrical transformers, hardstandings, access roads, cabling, borrow pits and a distribu...

Pre Application Notification
16 Nov 2026 Registered 26/01667/FUL

Hawthorn Cottage Hoprig Road Cockburnspath Scottish Borders TD13 5YF

Installation of 18no solar photo voltiac array to roof and 15KWh storage battery and inverter

Full Application
4 Nov 2026 Registered 26/01663/CLPU

5 Monkswood Gattonside Melrose Scottish Borders TD6 9NS

Installation of a ground-mounted solar photovoltaic array with associated Infrastructure and electric vehicle charging point to garage

Certificate of Lawful Proposed Use
30 Oct 2026 Registered 26/01644/FUL

The Coach House Spitalhaugh West Linton Scottish Borders EH46 7BH

Alterations to garage and Installation of 6no Solar Photo Voltaic array to roof

Full Application
27 Oct 2026 Registered 26/01621/SCO

Bowbeat Windfarm Innerleithen Scottish Borders

Construction and operation of the repowered Bowbeat Wind Farm comprising up to 9 turbines with a maximum blade tip height of 230m with a combined capa...

Scoping Opinion
26 Oct 2026 Decided 5 Nov 26/01616/PAN

Land At Dun Law Wind Farm Oxton Scottish Borders

Construction, operation and decommissioning of up to 10 wind turnbines with a maximum tip height of 220m with associated battery energy battery storag...

Pre Application Notification
21 Oct 2026 Decided 5 Nov 26/01604/PAN

Bowbeat Windfarm Innerleithen Scottish Borders

Installation of up to nine wind turbines with a mximum tip height of up to 230m and associated ancillary infrastructure and BESS

Pre Application Notification
21 Oct 2026 Registered 26/01569/FUL

The Bungalow Broadmeadows Yarrowford Selkirk Scottish Borders TD7 5LZ

Erection of replacement dwellinghouse and formation of ground based solar panel array

Full Application
20 Oct 2026 Registered 26/01577/FUL

Bowden Cottage Bowden Melrose Scottish Borders TD6 0ST

Installation of 14no Solar Photo Voltaic array to roof and 10no Solar Photo Voltaic array within garden ground.

Full Application
13 Oct 2026 Registered 26/01544/FUL

Land South Of Plot 6 Raecleugh Farm Westruther Raecleugh Road Scottish Borders

Installation of ground based solar panels array (revision to planning permission 25/01041/FUL)

Full Application
13 Oct 2026 Registered 26/01541/LBC

Elankara Main Street Swinton Duns Scottish Borders TD11 3JJ

Installation of a roof-mounted solar photovoltaic array and associated battery storage unit, together with the installation of a roof window.

Listed Building Consent
13 Oct 2026 Registered 26/01540/FUL

Elankara Main Street Swinton Duns Scottish Borders TD11 3JJ

Alterations to dwellinghouse to include installation of a roof-mounted solar photovoltaic array along with pole mounted EV charger and free standing a...

Full Application
9 Oct 2026 Approved 11 Nov 26/01530/FUL

6 Darlingfield Farm Cottages Gordon Scottish Borders TD3 6LE

Installation of solar photo voltaic array to roof, ground mounted ASHP and battery storage unit

Full Application
1 Oct 2026 Registered 26/01027/FUL

Langbank Steading Swinton Duns Scottish Borders TD11 3HY

Installation of ground mounted solar photo voltaic array

Full Application
1 Oct 2026 Approved 10 Nov 26/01460/FUL

Land East Of And Incorporating 177 Galashiels Road Galashiels Road Stow Scottish Borders

Installation of wall mounted ASHP to to South-East Elevation and installation of ground based solar photo voltaic array

Full Application
1 Oct 2026 Approved 16 Nov 26/01462/LBC

Land East Of And Incorporating 177 Galashiels Road Galashiels Road Stow Scottish Borders

Installation of wall mounted ASHP to South-East Elevation

Listed Building Consent
25 Sept 2026 Approved 29 Oct 26/01401/CLPU

11 Duns Road Swinton Duns Scottish Borders TD11 3JB

Installation of solar photo voltaic array to south and west elevations

Certificate of Lawful Proposed Use
24 Sept 2026 Registered 26/01398/FUL

Priorbank Hermitage Lane Kelso Scottish Borders TD5 7AN

Replacement windows and installation of roof mounted solar Photo Voltaic array

Full Application
18 Sept 2026 Withdrawn 19 Nov 26/01278/LBC

Annex South Of Tontine Hotel High Street Peebles Scottish Borders EH45 8AJ

Internal alterations and installation of solar photo voltaic array

Listed Building Consent
18 Sept 2026 Withdrawn 19 Nov 26/01277/FUL

Annex South Of Tontine Hotel High Street Peebles Scottish Borders EH45 8AJ

Internal alterations and installation of solar photo voltaic array

Full Application
11 Sept 2026 Registered 26/01348/FUL

Elm Cottage Carlops Scottish Borders EH26 9NF

Installation of ASHP (retrospective)

Full Application
3 Sept 2026 Registered 26/01316/SCR

Land To North Of The Gardens Newton Don Kelso Scottish Borders

Recommissioning of derelict hydro scheme

Screening Opinion
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Scottish Borders

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Scottish Borders?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Scottish Borders. You can also narrow the alert to a postcode, street, or drawn area.

We check Scottish Borders's planning portal daily. New solar & renewables applications appear here within a day of being published.