Solar and renewables in Rushcliffe

Rushcliffe received 25 renewable energy applications in the last 12 months, including 1 solar farm, 4 battery storage sites and 4 heat pumps. Of the 10 decided so far, 8 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

10
|
3
|
0

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 10 of 10 applications
26/01201/FUL 10 Jul 2026 Pending Decision

1A Cliff Drive Radcliffe On Trent Nottinghamshire NG12 1AX

Alterations to openings on front elevation, replacement UPVC windows/sofits/fascia on front elevation and installation of solar panels on rear elevati...

Rushcliffe 10 Jul 2026
26/01174/FUL 8 Jul 2026 Pending Decision

The Barn Church Lane Sibthorpe Nottinghamshire NG23 5PN

Construction of a single-storey entrance extension and single-storey garden extension, together with internal reconfiguration, new rooflights, alterat...

Full Application Rushcliffe 8 Jul 2026
26/01137/FUL 1 Jul 2026 Pending Decision

Four Winds Ash Lane Costock Nottinghamshire LE12 6UX

Installation of a ground- mounted solar photovoltaic (PV) array

Full Application Rushcliffe 1 Jul 2026
26/01108/CLUPRD 25 Jun 2026 Pending Decision

Normanton Beck Back Lane Normanton On The Wolds Nottinghamshire NG12 5NP

Application for Certificate of Proposed Lawful Development in respect of the construction an outdoor swimming pool 9.0m x 4.5m to the rear of the prop...

Certificate of Lawfulness Proposed Rushcliffe 25 Jun 2026
26/01106/FUL 24 Jun 2026 Pending Decision

39 Selby Lane Keyworth Nottinghamshire NG12 5AQ

Single storey rear extension includes roof lights. Alteration to fenestration. New hipped roof extension over existing garage, garage conversion to ha...

Full Application Rushcliffe 24 Jun 2026
26/01074/SCOEIA 18 Jun 2026 Pending Decision

Land West Of Trowell Lane Trowell Lane Sutton Bonington Nottinghamshire LE12 5RW

Scoping request for development for the Sutton Bonington Solar Farm

Scoping Opinion EIA Rushcliffe 18 Jun 2026
26/00953/PA14J 3 Jun 2026 Decided

Blue Diamond Garden Centre Fosse Way East Bridgford Nottinghamshire NG13 8LA

The application is to install rooftop PV modules at the EB Garden Centre.

Prior Approval Part 14 Class J Rushcliffe 3 Jun 2026
26/00798/FUL 8 May 2026 Approved

Shelton House Farm Main Road Shelton Nottinghamshire NG23 5JQ

Proposed detached garage with garden store room, includes roof lights and solar panels.

Full Application Rushcliffe 8 May 2026
26/00802/FUL 8 May 2026 Decided

Vale Cottage Lombard Street Orston Nottinghamshire NG13 9NG

Alterations and extension to existing dwelling, including raising height of existing ridge and eaves and new brick skin cladding to front elevation, a...

Rushcliffe 8 May 2026
26/00653/FUL 9 Apr 2026 Pending Decision

Acorn Hotel River Rooms 4 Radcliffe Road West Bridgford Nottinghamshire NG2 5FW

Demolish rear block, new rear extension, convert existing C1 to 16no. C3 flats, install solar panels.

Full Application Rushcliffe 9 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Rushcliffe

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Rushcliffe?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Rushcliffe. You can also narrow the alert to a postcode, street, or drawn area.

We check Rushcliffe's planning portal daily. New solar & renewables applications appear here within a day of being published.