Solar and renewables in Nottingham

Nottingham received 26 renewable energy applications in the last 12 months, including 1 battery storage site and 5 heat pumps. All 15 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

11
|
1
|
1
Get alerts for Nottingham

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
23 Sept 2026 Pending Consideration 26/01721/PATPD

2 Leen Drive Nottingham Nottingham City NG6 8EP

Prior Approval Application for the installation of a 440 kw solar PV roof mounted system at the existing Morrisons Foodstore

Prior Approval of Solar Panels Nottingham
1 Sept 2026 Pending Consideration 26/01148/LLIS1

Old Basford Health Centre 1 Bailey Street Nottingham Nottingham City NG6 0HD

Installation of 92 new solar panels on the south and west facing roof slopes on the non-historic buildings. Erection of fencing on west boundary on th...

Listed Building Consent Nottingham
25 Aug 2026 Pending Consideration 26/01331/PFUL3

3 Phoenix Place Nottingham Nottingham City NG8 6BA

Installation of 122 solar panels to front and sides of roof, installation of external plant within enclosure on rear elevation, infilling of 2x existi...

Full planning application Nottingham
14 Aug 2026 Awaiting decision 26/01252/PFUL3

Firbeck Academy Firbeck Road Nottingham Nottingham City NG8 2FB

Proposed battery energy storage system and associated infrastructure

Full planning application Nottingham
7 Aug 2026 Pending Consideration 26/01413/PFUL3

Clumber Lodge 1 Maxtoke Road Nottingham Nottingham City NG7 1EG

Rear first floor dormer extension; and additional window at ground floor; and the relocation of 4no. PV panels; and pruning of a group of Confier tree...

Full planning application Nottingham
6 Aug 2026 Pending Consideration 26/01187/PFUL3

48 Hollinwell Avenue Nottingham Nottingham City NG8 1JZ

Conversion of an existing garage to a playroom and bathroom. The raising of the height of the building by 2.45m and the erection of a dual pitched roo...

Full planning application Nottingham
6 Aug 2026 Pending Consideration 26/01046/PFUL3

26 Parkside Nottingham Nottingham City NG8 2NN

Addition of a dual pitched roof to the existing two-story flat roof rear extension. Erection of a two-storey pitched roof rear extension. Erection of ...

Full planning application Nottingham
31 Jul 2026 Awaiting decision 26/01065/PFUL3

Holy Trinity Church Farnborough Road Nottingham Nottingham City NG11 9DG

Air source heat pump and PV panel installation and replacement of windows

Full planning application Nottingham
20 Jul 2026 Approved 14 Sep 26/01079/PFUL3

16 Atlas Street Nottingham Nottingham City NG2 2AA

Installation of an air source heat pump on the north (front) side of the property

Full planning application Nottingham
9 Jul 2026 Pending Consideration 26/01068/PFUL3

Stockhill Fire Station Stockhill Lane Nottingham Nottingham City NG6 0LG

Construction of a new three-storey fire station adjacent to the existing Stockhill Fire Station, allowing services to remain operational during constr...

Full planning application Nottingham
8 Jul 2026 Approved 28 Aug 26/01171/PATPD

Crowne Plaza Nottingham Wollaton Street Nottingham Nottingham City NG1 5RH

Prior approval for the installation of solar PV panels on the rooftops

Prior Approval of Solar Panels Nottingham
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Nottingham

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Nottingham?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Nottingham. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Nottingham's planning portal daily. New solar & renewables applications appear here within a day of being published.