Solar and renewables in Redbridge

Redbridge received 31 renewable energy applications in the last 12 months, including 5 heat pumps. All 26 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

10
|
5
|
1
Get alerts for Redbridge

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
30 Sept 2026 Approved 2 Oct 2514/26

2, Park Road, WANSTEAD, London, E12 5HQ

Installation of air source heat pump. (summary)

Cert. Lawfulness Proposed (fasttrack) Redbridge
17 Sept 2026 Under assessment 2410/26

21, Kings Avenue, Woodford Green, IG8 0JD

Installation of 6no. solar panels on flat roof of rear extenion and 9no solar pa

Prior Approval Determination Redbridge
17 Sept 2026 Under assessment 2395/26

62 and 64, Wellesley Road, Wanstead, London

62 Wellesley Road: Single storey side-return infill extension. Double storey re

Full Planning Permission Redbridge
11 Sept 2026 Under assessment 2329/26

St Gabriels Church, Park Road, Wanstead, London, E12 5HG

Installation of solar panels and heating/cooling system. Single storey side and

Listed Building Consent Redbridge
11 Sept 2026 Under assessment 2328/26

St Gabriels Church, Park Road, Wanstead, London, E12 5HG

Installation of solar panels and heating/cooling system. Single storey side and

Full Planning Permission Redbridge
21 Jul 2026 Approved 4 Sep 1918/26

167, King George Hospital, Barley Lane, Ilford, IG3 8YB

Installation of photovoltaic (PV) solar carports over existing staff car park to

Prior Approval Determination Redbridge
18 Jul 2026 Approved 3 Aug 1897/26

61, Grosvenor Road, Wanstead, London, E11 2ES

Installation of a single air source heat pump unit to the side elevation. (Summa

Cert. Lawfulness Proposed Redbridge
14 Jul 2026 Approved 18 Aug 1855/26

167, King George Hospital, Barley Lane, Ilford, IG3 8YB

Installation of a solar photovoltaic (PV) system on the pitched roofs and one fl

Prior Approval Determination Redbridge
13 Jul 2026 Approved 20 Aug 1796/26

275, Eton Road, Ilford, IG1 2UL

Solar panels installation. Loft conversion with a rear dormer. Hip to gable roof

Cert. Lawfulness Proposed Redbridge
13 Jul 2026 Approved 11 Aug 1675/26

10, Wordsworth Avenue, South Woodford, London, E18 2HE

Replace existing outbuilding roof including one rear rooflight and solar roof ti

Householder (fasttrack) Redbridge
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Redbridge

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Redbridge?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Redbridge. You can also narrow the alert to a postcode, street, or drawn area.

We check Redbridge's planning portal daily. New solar & renewables applications appear here within a day of being published.