Solar and renewables in Epping Forest

Epping Forest received 25 renewable energy applications in the last 12 months, including 1 solar farm, 3 battery storage sites and 3 heat pumps. Of the 19 decided so far, 12 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Epping Forest

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 3 of 3 applications
19 Oct 2026 Under Consultation EPF/1975/26

33, St Marys Way, Chigwell, IG7 5BX

Installation of air source heat pump.

Householder planning permission Epping Forest
30 Sept 2026 Under Consultation EPF/1855/26

Tudor Lodge, Common Road, Waltham Abbey, EN9 2DF

Demolition of existing residential outbuildings. Erection of 1 no. four bedroom detached dwelling with associated parking, new vehicle access and air ...

Full planning permission Epping Forest
26 Aug 2026 Approved 15 Oct EPF/1646/26

15, Spareleaze Hill, Loughton, IG10 1BS

Proposed extensions, roofing works including solar panels and dormers, boundary treatments and creation of therapy space (Revised application to EPF/1...

Householder planning permission Epping Forest
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Epping Forest

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Epping Forest?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Epping Forest. You can also narrow the alert to a postcode, street, or drawn area.

We check Epping Forest's planning portal daily. New solar & renewables applications appear here within a day of being published.